Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
TANGGUNG JAWAB PARA PIHAK DALAM PELAKSANAAN KONTRAK KERJA KONSTRUKSI (SUATU PENELITIAN PADA KONTRAK PEMBANGUNAN TOWER TRANSMISI ANTARA PT MEDAN SMART JAYA DAN PT PLN (PERSERO) SUMBAGUT I)
Pengarang
CUT PUTRI SORAYA - Personal Name;
Dosen Pembimbing
Khairani - 196703221993032001 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
1803101010110
Fakultas & Prodi
Fakultas Hukum / Ilmu Hukum (S1) / PDDIKTI : 74201
Subject
Penerbit
Banda Aceh : Fakultas Hukum., 2022
Bahasa
Indonesia
No Classification
346.022
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Penelitian ini bertujuan mengetahui, menjelaskan, dan menganalisis pelaksanaan kontrak kerja konstruksi oleh para pihak dan upaya penyelesaian sengketa yang dilakukan dalam permasalahan keterlambatan terkait pekerjaan konstruksi. Hasil penelitian diketahui bahwa pelaksanaan kontrak kerja konstruksi antara PT Medan Smart Jaya dengan PT PLN (Persero) Sumbagut I belum terlaksana sebagaimana yang diperjanjikan, pihak penggunan jasa maupun penyedia jasa konstruksi melakukan wanprestasi dalam bentuk keterlambatan melakukan kewajibannya dan upaya penyelesaian sengketa yang dilakukan oleh para pihak adalah melalui musyawarah yang dilakukan dengan cara pengajuan amandemen/Addendum perpanjangan kontrak. Disarankan kepada para pihak di masa yang akan datang apabila melaksanakan kontrak kerja konstruksi harus memperjelas mengenai waktu pelaksanaan dan sanksi-sanksi yang disepakati, jika keterlambatan yang terjadi terus berulang seperti yang terjadi dalam permasalahan ini dan dalam penyelesaian sengketa ini apabila tidak dapat diselesaikan secara musyawarah maka dapat diselesaikan secara litigasi melalui jalur hukum.
This research aims to be informed , explicate, and analyze the implementation of the construction work contract by the parties and the dispute resolution efforts conducted in the problem of delays related to the construction work. The results of this research showed that the implementation of the construction work contract between Medan Smart Jaya LLC and PLN (Persero) LLC Sumbagut I had not been implemented according to the agreement, the service users and the construction service providers defaulted in the form of delays in carrying out their obligations and the dispute resolution efforts carried out by the parties is through deliberation which is conducted by way of submitting an amendment/Addendum to the contract extension. It is recommended to the parties in the future when carrying out a construction work contract to clarify the implementation time and agreed sanctions, if the delays that occur continue to repeat as happened in this problem and in the settlement of this dispute if it cannot be resolved amicably then it can be resolved through litigation such as legal actions.
WANPRESTASI DALAM KONTRAK KERJA KONSTRUKSI ANTARA PT. BERKAH SALIM PERDANA DENGAN DINAS PENDIDIKAN ACEH (SUATU PENELITIAN DI PROYEK PEMBANGUNAN ASRAMA SISWA MTSS TGK. CHIK, KABUPATEN PIDIE) (Rachmad Firdaus, 2018)
TANGGUNG JAWAB PELAKSANA KONSTRUKSI TERHADAP PROYEK PEMERINTAH (STUDI KASUS PROYEK PEMBANGUNAN DERMAGA PENYEBERANGAN FERRY ULEE LHEUE DAN RUANG KELAS BARU MTSN 11 BANDA ACEH) (Eka Kurniasari, 2025)
WANPRESTASI KONTRAK KERJA KONSTRUKSI ANTARA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH DENGAN PT. JUNI KARYA JAYA DALAM PEMBANGUNAN JALAN SINABANG-SIBIGO (ZYCRA SABRINA, 2022)
WANPRESTASI DALAM PELAKSANAAN KONTRAK KERJA KONSTRUKSI PEMBANGUNAN GEDUNG PROMOSI SENTRA INDUSTRI KECIL DAN MENENGAH NILAM DI KABUPATEN ACEH JAYA (JANATUL AFIFAH, 2024)
FORCE MAJEURE DAMPAK COVID-19 SEBAGAI ALASAN PENUNDAAN PENYELESAIAN KONTRAK KERJA KONSTRUKSI (HERZIA MAULIVA, 2023)