Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
ANALISIS PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN PERBAIKAN RUAS JALAN SIMPANG TUJUH–SIMPANG LAMREUNG, KABUPATEN ACEH BESAR
Pengarang
ARGA SELVA RIZKY - Personal Name;
Dosen Pembimbing
Fitrika Mita Suryani - 196812211998022001 - Dosen Pembimbing I
Febriyanti Maulina - 197802242008122002 - Dosen Pembimbing II
Lulusi - 197301291999032001 - Penguji
Nomor Pokok Mahasiswa
2104001010026
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (D3) / PDDIKTI : 22401
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Sipil (D3)., 2026
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Pekerjaan perbaikan ruas jalan memerlukan penggunaan alat berat yang memiliki produktivitas optimal agar pelaksanaan proyek dapat berlangsung secara efektif, efisien, dan sesuai dengan target waktu yang telah ditetapkan. Produktivitas alat berat dipengaruhi oleh berbagai faktor, seperti waktu siklus kerja, kondisi lapangan, efisiensi operator, serta karakteristik material yang digunakan. Penelitian ini bertujuan untuk menganalisis produktivitas Dump Truck, Motor Grader, dan Vibro Roller pada pekerjaan perbaikan ruas Jalan Simpang Tujuh–Simpang Lamreung, Kabupaten Aceh Besar, serta membandingkan produktivitas aktual dengan produktivitas berdasarkan Analisis Harga Satuan Pekerjaan (AHSP) Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR). Metode penelitian yang digunakan adalah deskriptif kuantitatif dengan pendekatan studi lapangan (field study). Pengumpulan data dilakukan melalui metode time study, yaitu dengan mengamati dan mencatat waktu siklus (cycle time) masing-masing alat berat yang meliputi waktu pemuatan (loading), pengangkutan (hauling), pembongkaran (dumping), perjalanan kembali (return), serta waktu operasi Motor Grader dan Vibro Roller selama pekerjaan berlangsung. Pengamatan dilaksanakan pada segmen STA 0+358 sampai STA 0+558,04 selama 10 hari kerja efektif. Data hasil pengamatan kemudian dianalisis untuk memperoleh produktivitas aktual dan dibandingkan dengan produktivitas teoritis berdasarkan AHSP. Hasil penelitian menunjukkan bahwa produktivitas aktual Dump Truck sebesar 37,17 m³/jam, Motor Grader sebesar 2.822 m²/jam, dan Vibro Roller sebesar 1.326 m²/jam. Sementara itu, produktivitas berdasarkan AHSP masing-masing sebesar 40,50 m³/jam, 3.000 m²/jam, dan 1.450 m²/jam. Hasil perbandingan menunjukkan bahwa produktivitas aktual ketiga alat berat masih berada di bawah produktivitas teoritis dengan selisih berturut-turut sebesar 8,22%, 5,93%, dan 8,55%. Perbedaan tersebut dipengaruhi oleh waktu siklus kerja, jarak angkut material, kondisi permukaan jalan, jumlah lintasan, kondisi material Base B, serta efisiensi kerja alat dan operator. Secara keseluruhan, penggunaan alat berat pada pekerjaan perbaikan ruas Jalan Simpang Tujuh–Simpang Lamreung dapat dikategorikan cukup efektif, meskipun masih terdapat peluang peningkatan produktivitas melalui pengelolaan waktu kerja dan koordinasi antaralat yang lebih optimal.
Road repair projects require the use of heavy equipment with optimal productivity to ensure the project proceeds effectively, efficiently, and meets established time targets. Heavy equipment productivity is influenced by various factors, such as work cycle time, site conditions, operator efficiency, and the characteristics of the materials used. This study aims to analyze the productivity of dump trucks, motor graders, and vibro rollers during the repair of the Simpang Tujuh–Simpang Lamreung road section in Aceh Besar Regency, and to compare actual productivity with the productivity standards set by the Ministry of Public Works and Public Housing (PUPR) in the Unit Price Analysis (AHSP). A quantitative descriptive method using a field study approach was employed. Data collection was conducted via time studies, involving the observation and recording of cycle times for each piece of equipment—including loading, hauling, dumping, and return times—as well as the operating times for motor graders and vibro rollers during the work. Observations were carried out on the segment between stationing (STA) 0+358 and STA 0+558.04 over a period of 10 effective working days. The observational data were analyzed to determine actual productivity and compared with theoretical productivity based on AHSP standards. The results indicate that the actual productivity was 37.17 m³/hour for dump trucks, 2,822 m²/hour for motor graders, and 1,326 m²/hour for vibro rollers. Meanwhile, the AHSP-based productivity figures were 40.50 m³/hour, 3,000 m²/hour, and 1,450 m²/hour, respectively. The comparison reveals that the actual productivity of all three types of equipment remained below the theoretical productivity, with respective variances of 8.22%, 5.93%, and 8.55%. These differences are influenced by work cycle times, material haul distances, road surface conditions, the number of passes, the condition of the Base B material, and the operational efficiency of both the equipment and the operators. Overall, the use of heavy equipment for the repair of the Simpang Tujuh–Simpang Lamreung road section can be considered reasonably effective, although there remains scope to enhance productivity through better management of working time and more optimal coordination between equipment units.
ANALISIS PENGARUH TOTAL RESISTANCE TERHADAP PRODUKTIVITAS DAN SPEED UNIT ALAT ANGKUT DI PIT 4 PT BARA ENERGI LESTARI (Mila Mulidar, 2025)
IDENTIFIKASI KERUSAKAN JALAN MENGGUNAKAN METODE SURFACE DISTRESS INDEX BESERTA ESTIMASI BIAYA PERBAIKAN STUDI KASUS RUAS JALAN SIMPANG LAMREUNG – COT IRI (Firman, 2024)
ANALISIS BIAYA OPERASIONAL KENDARAAN (BOK) DAN NILAI WAKTU PERJALANAN DI RUAS JALAN SIMPANG
LAMREUNG – DARUSSALAM (FARHAN ANWAR FUADI, 2014)
EVALUASI KERUSAKAN PERKERASAN JALAN DENGAN METODE BINA MARGA (STUDI KASUS RUAS JALAN LAMREUNG KECAMATAN KRUENG BARONA JAYA KABUPATEN ACEH BESAR) (Novizal, 2019)
EVALUASI KINERJA SIMPANG EMPAT TAK BERSINYAL PADA SIMPANG PUNGE KECAMATAN MEURAXA BANDA ACEH (mustika rachmatia stephani, 2016)