Electronic Theses and Dissertation
Universitas Syiah Kuala
LAPORAN KERJA PRAKTEK
PENANGANAN LONG SEGMENT PEMELIHARAAN BERKALA PENINGKATAN REKONSTRUKSI JALAN LEUPE – LHUET – MUKHAN KECAMATAN JAYA KABUPATEN ACEH JAYA
Pengarang
NAUFAL MUTAWAKKIL - Personal Name;
Dosen Pembimbing
Fitrika Mita Suryani - 196812211998022001 - Dosen Pembimbing I
Ibnu Abbas - 196203281989031002 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
2004001010015
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (D3) / PDDIKTI : 22401
Subject
Kata Kunci
Penerbit
Banda Aceh : Fak. Teknik Sipil Diploma III., 2025
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
ABSTRAK
Proyek peningkatan dan pemeliharaan berkala Jalan Leupe – Lhuet – Mukhan di Kecamatan Jaya, Kabupaten Aceh Jaya merupakan bagian dari program Dana Alokasi Khusus (DAK) Tahun Anggaran 2024. Proyek ini bertujuan untuk memperbaiki kondisi jalan agar kembali mantap, meningkatkan umur layanan jalan, serta menunjang konektivitas antarwilayah. Panjang penanganan jalan mencapai 1,63 km dengan ruang lingkup pekerjaan meliputi galian dan timbunan tanah, lapis pondasi agregat kelas B dan A, pelapisan aspal AC-BC dan AC-WC, serta pekerjaan struktur bahu jalan.
Metode pelaksanaan meliputi tahapan survei, pelaksanaan teknis lapangan, pengawasan mutu, dan pengujian kepadatan. Hasil kegiatan menunjukkan bahwa pekerjaan dilakukan sesuai spesifikasi teknis Bina Marga, dengan total volume pekerjaan agregat dan aspal mencapai ±2.306,6 m³. Proyek ini memberikan kontribusi nyata dalam meningkatkan kualitas layanan infrastruktur jalan dan mendukung kelancaran mobilitas masyarakat serta pertumbuhan ekonomi wilayah.
Kata kunci: pemeliharaan jalan, agregat, aspal, Base A, Base B, AC-BC, AC-WC, proyek konstruksi
ABSTRACT The project for periodic maintenance and reconstruction improvement of the Leupe – Lhuet – Mukhan Road in Jaya Subdistrict, Aceh Jaya Regency, is part of the 2024 Special Allocation Fund (DAK) program. This project aims to restore the road to a serviceable condition, extend its service life, and enhance interregional connectivity. The project handles a total road length of 1.63 km, with scopes of work including earthworks, sub-base and base course aggregate layers (Class B and Class A), asphalt pavement layers (AC-BC and AC-WC), and structural work including shoulder construction. The implementation method involves surveying, technical field execution, quality control, and compaction testing. The results show that the work was carried out according to technical specifications and standards set by Bina Marga, with a total volume of ±2,306.6 m³ for aggregates and asphalt. This project has provided a real contribution to improving road infrastructure services and supporting the mobility and economic development of the local community. Keywords: road maintenance, aggregate, asphalt, Base A, Base B, AC-BC, AC-WC, construction project
EVALUASI KERUSAKAN PERKERASAN JALAN DENGAN METODE BINA MARGA (STUDI KASUS RUAS JALAN LAMREUNG KECAMATAN KRUENG BARONA JAYA KABUPATEN ACEH BESAR) (Novizal, 2019)
PENENTUAN PRIORITAS REKONSTRUKSI JALAN DI KECAMATAN SETIA BAKTI KABUPATEN ACEH JAYA (Fazrimiara, 2022)
MANAJEMEN PENANGANAN KONSTRUKSI JALAN RAYA (STUDI KASUS JALAN SYIAH KUALA BANDA ACEH) (Afrizal, 2025)
ANALISIS KERUSAKAN JALAN AKIBAT BEBAN BERLEBIH DENGAN METODE PAVEMENT CONDITION INDEX (PCI), SURFACE DISTRESS INDEX (SDI) DAN INTERNATIONAL ROUGHNESS INDEX (IRI) RN(STUDI KASUS: JALAN SEUNEUBOK LAPANG – BABAH KRUENG KECAMATAN PEUREULAK TIMUR KABUPATEN ACEH TIMUR) (Nurjannah, 2024)
EVALUASI TERHADAP KERUSAKAN JALAN DENGAN MENGGUNAKAN METODE BINA MARGA (STUDI KASUS JALAN TENGKU CHIK BA KURMA, KABUPATEN ACEH BESAR) (Muchtaruddin, 2017)