Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PRARANCANGAN PABRIK BIOETANOL BIOFUEL DARI RNTANDAN KOSONG KELAPA SAWIT MENGGUNAKAN RNMETODE PRE-TREATMENT ALKALINE HYDROLYSISRNDENGAN KAPASITAS PRODUKSI 30.000 TON/TAHUN
Pengarang
TATA SHELVYNAR MEILINDA - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1904103010059
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2023
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik Bioetanol Biofuel ini menggunakan bahan baku
Tandan Kosong Kelapa Sawit dengan menggunakan metode Pre-Treatment
Alkaline Hydrolysis. Kapasitas produksi pabrik ini adalah 30.000 Ton/Tahun
dengan hari kerja 330 hari/tahun. Pabrik ini direncanakan didirikan di Kelurahan
Pelintung, Kecamatan Medan Kampai, Kabupaten Dumai, Provinsi Riau dengan
luas tanah 22.697 m2
. Bentuk perusahaan yang direncanakan adalah Perseroan
Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf
(tenaga kerja sebanyak 150 orang). Sumber air pabrik ini berasal dari Sungai Rokan
Hilir, Kabupaten Rokan Hilir, Provinsi Riau dengan total kebutuhan air sebesar
136.831,44 kg/jam, dan untuk kebutuhan listrik diperoleh dari generator dengan
daya 2.193,37 kW.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp. 162.662.783.915,-
2. Working Capital Investment (WCI) = Rp. 28.705.197.162,-
3. Total Capital Investment (TCI) = Rp. 191.367.981.077,-
4. Total Production Cost (TPC) = Rp. 373.178.948.920,-
5. Sales Cost (SC) = Rp. 501.501.964.823,-
6. Laba Bersih = Rp. 96.242.261.927,-
7. Pay Out Time (POT) = 2,5 tahun
8. Break Event Point (BEP) = 34 %
9. Internal Rate of Return (IRR) = 42,92 %
10. Rate of Return (ROR) = 40,29 %
Preliminary plant design of Bioethanol Biofuel uses Oil Palm Empty Fruit Bunches as raw materials using Alkaline Hydrolysis Pre-Treatment. The production capacity of this factory is 30.000 tons/year with 330 working days/year. The location of the factory is planned to be established in Pelintung Village, Medang Kampai District, Dumai Regency, Riau Province with a land area of 22.697 m2. The planned form of this company is an Incorporated (Inc.) using the line and staff structure method (a workforce of 150 people). The water source for this factory comes from the Rokan Hilir River, Rokan Hilir Regency, Riau Province with a total water needed is 136.831,44 kg/hour, and for electricity needs it is obtained from generator with a power of 2.193,37 kW. The result of the economic analysis obtained are as follows: 1. Fixed Capital Investment (FCI) = Rp. 162.662.783.915,- 2. Working Capital Investment (WCI) = Rp. 28.705.197.162,- 3. Total Capital Investment (TCI) = Rp. 191.367.981.077,- 4. Total Production Cost (TPC) = Rp. 373.178.948.920,- 5. Sales Cost (SC) = Rp. 501.501.964.823,- 6. Net Profit = Rp. 96.242.261.927,- 7. Pay Out Time (POT) = 2,5 years 8. Break Event Point (BEP) = 34 % 9. Internal Rate of Return (IRR) = 42,92 % 10. Rate of Return (ROR) = 40,29 %
PRARANCANGAN PABRIK BIOETANOL BIOFUEL DARI RNTANDAN KOSONG KELAPA SAWIT MENGGUNAKAN RNMETODE PRE-TREATMENT ALKALINE HYDROLYSISRNDENGAN KAPASITAS PRODUKSI 30.000 TON/TAHUN (TATA SHELVYNAR MEILINDA, 2023)
PRARANCANGAN PABRIK BIOETANOL DARI TANDAN KOSONG KELAPA SAWIT DENGAN KAPASITAS PRODUKSI 90.000 TON/TAHUN (Cut Fitriani, 2017)
PRARANCANGAN PABRIK BIOETANOL DARI TANDAN KOSONG KELAPA SAWIT DENGAN KAPASITAS PRODUKSI 90.000 TON/TAHUN (Siti Shara, 2017)
PRARANCANGAN PEMBANGKIT LISTRIK DESENTRALISASI DARI TANDAN KOSONG KELAPA SAWIT (TKKS) DENGAN KAPASITAS PRODUKSI 5 MWH (Erva Yulia Ningsih, 2024)
PRARANCANGAN PEMBANGKIT LISTRIK DESENTRALISASI DARI TANDAN KOSONG KELAPA SAWIT (TKKS) DENGAN KAPASITAS PRODUKSI 5 MWH (Ninda fadhliah, 2024)