Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
ANALISIS FAKTOR PENGHAMBAT GALANGAN KAPAL DI KOTA BANDA ACEH MENGGUNAKAN METODE FUZZY AHP
Pengarang
Hayatun Nuvus - Personal Name;
Dosen Pembimbing
Rizwan - 197609062008011008 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
1911103010073
Fakultas & Prodi
Fakultas Kelautan dan Perikanan / Pemanfaatan Sumberdaya Perikanan (S1) / PDDIKTI : 54246
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Kelautan dan perikanan., 2023
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
ABSTRAK
Galangan kapal perikanan di Kota Banda Aceh adalah galangan kapal milik swasta dan dikelola secara kekeluargaan. Galangan kapal disini aktif melakukan kegiatan perawatan, perbaikan, dan pembuatan kapal baru ketika adanya permintaan dari konsumen. Galangan kapal di Kota Banda Aceh pada umumnya membuat kapal bermaterial kayu. Permasalahan yang dihadapi sekarang yaitu banyaknya kapal yang terbengkalai akibat kurangnya finansial, SDA, SDM dan Alam, hal tersebut menjadi faktor penghambat untuk kemajuan dan pengembangan galangan kapal. Tujuan dari penelitian ini yaitu untuk mengetahui faktor penghambat yang ada pada galangan kapal di kota Banda Aceh dan mencarikan alternatif solusi untuk permasalahan tersebut. Metode yang digunakan pada penelitian ini yaitu metode survei yang digunakan untuk melihat gejala-gejala yang ada dan mengumpulkan data mengenai faktor-faktor yang berkaitan dengan variabel penelitian dan kemudian dianalisis menggunakan metode Fuzzy AHP. Hasil penelitian ini menunjukkan bahwa faktor penghambat finansial adalah faktor yang paling berpengaruh pada galangan kapal dengan nilai yang dihasilkan 0,4635, faktor penghambat SDA bernilai 0,35675, faktor penghambat SDM bernilai 0,2865 dan faktor penghambat alam adalah penghambat yang paling rendah atau kurang berpengaruh dengan nilai seesar 0,14325. Adapun alternatif solusi untuk masalah finansial yaitu adanya peminjaman modal dan investasi. Alternatif untuk sumberdaya alam yaitu adanya penambahan stok minimum untuk mengantisipasi kelangkaan stok dan keterlambatan pengiriman bahan dan alat. Adapun alternatif untuk sumberdaya manusia yaitu adanya kantor, struktur organisasi dan kesadaran terhadap K3. Adapun alternatif untuk alam yaitu adanya gedung atau pemasangan terpal untuk daerah tempat pembangunan kapal, pengelolaan lahan yang baik dan studi tentang dampak alam yang lainnya.
Kata Kunci: Alternatif Solusi, Fuzzy AHP, Galangan Kapal, Faktor Penghambat, Kapal Terbengkalai
ABSTRACT The fishing shipyard in Banda Aceh City is a privately owned shipyard and is managed in a family manner. The shipyard here is active in carrying out maintenance, repair and construction of new ships when there is demand from consumers. Shipyards in Banda Aceh City generally make ships made of wood. The problem that is currently being faced is that there are many abandoned ships due to lack of finance, natural resources, human and natural resources, this is an inhibiting factor for the progress and development of shipyards. The purpose of this study is to determine the inhibiting factors that exist in shipyards in the city of Banda Aceh and find alternative solutions to these problems. The method used in this study is a survey method used to look at existing symptoms and collect data on factors related to research variables and then analyzed using the Fuzzy AHP method. The results of this study indicate that the financial inhibiting factor is the most influential factor in the shipyard with the resulting value of 0.4635, the inhibiting factor of Natural Resources is worth 0.35675, the inhibiting factor of Human Resources is worth 0.2865 and the inhibiting factor of natural resources is the inhibiting factor the lowest or less influential with a value of 0.14325. The alternative solutions to financial problems are capital loans and investments. An alternative for natural resources is the addition of a minimum stock to anticipate stock scarcity and delays in the delivery of materials and tools. As for the alternatives for human resources, namely the existence of an office, organizational structure and awareness of occupational safety and health. As for alternatives for nature, namely the existence of buildings or installation of tarpaulins for areas where ships are built, good land management and studies of other natural impacts. Keywords: Alternative Solutions, Fuzzy AHP, Shipyards, Inhibiting Factors, Abandoned Ships
SISTEM PENDUKUNG KEPUTUSAN UNTUK PENENTUAN PRIORITAS PERBAIKAN KAPAL MENGGUNAKAN FUZZY LOGIC DI GALANGAN KAPAL, LAMPULO KOTA BANDA ACEH (M. AHLUL NAZRI, 2025)
ANALISIS PENONGKATAN KUALITAS LAYANAN JASA REPARASI KAPAL DI GALANGAN KAPAL PIDIE JAYA MENGGUNAKAN METODE FUZZY AHP (CUT FILNA AZRIANA, 2025)
PENGARUH FAKTOR OPERASIONAL DAN LOGISTIK DALAM GALANGAN KAPAL TRADISIONAL MENGGUNAKAN METODE FUZZY TIME SERIES CHENG (STUDI KASUS: LAMPULO, BANDA ACEH) (AMIRATUD DIANA, 2025)
KEADAAN FAKTOR PRODUKSI PADA USAHA GALANGAN KAPAL KAYU DI LAMPULO DAN GAMPONG JAWA, BANDA ACEH (LAILATUL HIDAYAH, 2024)
STUDI KLASTERISASI INDUSTRI GALANGAN KAPAL KAYU BERDASARKAN UKURAN KAPAL PERIKANAN DI BANDA ACEH DAN ACEH BESAR MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) (AYANA RIZKI, 2020)