PRARANCANGAN PABRIK BIOETANOL DARI AMPAS SAGU MENGGUNAKAN REAKTOR SIMULTANEOUS SACCHARIFICATION AND FERMENTATION (SSF) DENGAN KAPASITAS PRODUKSI 30.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK BIOETANOL DARI AMPAS SAGU MENGGUNAKAN REAKTOR SIMULTANEOUS SACCHARIFICATION AND FERMENTATION (SSF) DENGAN KAPASITAS PRODUKSI 30.000 TON/TAHUN


Pengarang

FAUZIL HADIF - Personal Name;

Dosen Pembimbing

Umi Fathanah - 197404032000122001 - Dosen Pembimbing I
Azwar - 197005211998021001 - Dosen Pembimbing II
Syaubari - 196508041992031002 - Penguji
Lia Mairiza - 197405232000032001 - Penguji
Pocut Nurul Alam - 196608221997022002 - Penguji



Nomor Pokok Mahasiswa

1704103010056

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Penerbit

Banda Aceh : Fakultas Teknik Kimia., 2022

Bahasa

Indonesia

No Classification

660

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik Bioetanol ini menggunakan limbah ampas sagu sebagai bahan
baku. Kapasitas produksi pabrik Bioetanol ini adalah 30.000 ton/tahun dengan hari
kerja 330 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan
Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan
tenaga kerja untuk menjalankan perusahaan ini berjumlah 150 orang. Lokasi pabrik
direncanakan didirikan di di Desa Tebing Tinggi, Kabupaten Meranti, Riau dengan
luas tanah 30.000 m2
. Sumber air pabrik Bioetanol ini berasal dari Sungai Kampar,
Kabupaten Meranti dan untuk memenuhi kebutuhan listrik diperoleh dari
Perusahaan Listrik Negara (PLN) dan Generator dengan daya 1.751,79 kW.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
1. Fixed Capital Investment = Rp177.664.658.060,-
2. Working Capital Investment = Rp19.629.406.451,-
3. Total Capital Investment = Rp196.294.064.511,-
4. Total Biaya Produksi = Rp575.550.497.974,-
5. Hasil Penjualan = Rp685.472.722.405,-
6. Laba bersih = Rp82.441.668.324,-
7. Pay Out Time (POT) = 3,43 tahun
8. Break even Point (BEP) = 40,74%
9. Internal Rate of Return (IRR) = 32,27%

The design of this Bioethanol plant uses sago dregs as raw material raw. The production capacity of this Bioethanol plant is 30,000 tons/year with a day work 330 days/year. The planned form of company is the Company Limited (PT) using the line and staff structure method. Needs The workforce to run this company is 150 people. Factory location planned to be established in Tebing Tinggi Village, Meranti Regency, Riau with land area 30.000 m2 . The water source for this Bioethanol plant comes from the Kampar River, Meranti Regency and to meet electricity needs, it is obtained from State Electricity Company (PLN) and Generator with a power of 1,751.79 kW. The results of the economic analysis obtained are as follows: 1. Fixed Capital Investment = Rp177,664,658,060,- 2. Working Capital Investment = Rp19,629,406,451,- 3. Total Capital Investment = Rp.196.294.064.511,- 4. Total Production Cost = Rp.575,550,497,974,- 5. Sales Result = Rp.685.472.722.405,- 6. Net profit = Rp82,441,668,324,- 7. Pay Out Time (POT) = 3.43 years 8. Break even Point (BEP) = 40.74% 9. Internal Rate of Return (IRR) = 32.27%