Universitas Syiah Kuala | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

KAJIAN DISTRIBUSI ALIRAN INTAKE KE PLTMH AKIBAT PERUBAHAN ALIRAN DI HULU SUNGAI

SUFRIZALIANSYAH

Micro hydro Power (MHP) Rampah planned to power as many as 95 heads of house holds with an installed power capacity of 20 kW. Source water comes from rivers by building dams Rampah intake. Intake should be on the basis of a steady stream, so it does not impede the flow of water entering the intake. The writing is focused on the stability of the river going up stream along the 300 m intake, based on the difference between the two cross-sectional sed…

DESAIN PROTOTIPE PLTPH MENGGUNAKAN GENERATOR MAGNET PERMANEN FLUKS AKSIAL STA…

BOYHAKI

Generator magnet permanen hamper sama kontruksinya dengan generator sinkron arus bolak – balik. Kumparan jangkar diletakkan pada bagian stator dan kumparan medan digantikan oleh magnet permanen. Generator yang dirancang pada penelitian ini adalah jenis generator magnet permanen fluks aksial stator ganda yang mempunyai putaran rendah. Generator magnet permanen fluks aksial stator ganda yang dirancang terdiri atas rotor yang tersusun oleh magnet permanen 24 kutub dan kumparan stator yang terd…


    SERVICES DESK