PRARANCANGAN PABRIK KA-OIL DARI SIKLOHEKSAN DENGAN KAPASITAS PRODUKSI 3.750 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK KA-OIL DARI SIKLOHEKSAN DENGAN KAPASITAS PRODUKSI 3.750 TON/TAHUN


Pengarang

MUHAMMAD DZULFIKAR - Personal Name;

Dosen Pembimbing

Hisbullah - 197007131997021002 - Dosen Pembimbing I
Mukhlishien - 196208021992031003 - Dosen Pembimbing I



Nomor Pokok Mahasiswa

1704103010071

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Penerbit

Banda Aceh : Fakultas Teknik Kimia., 2022

Bahasa

Indonesia

No Classification

660

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik KA-Oil ini menggunakan sikloheksan sebagai bahan baku. Kapasitas produksi pabrik KA-Oil ini adalah 3.750 ton/tahun dengan hari kerja yaitu 340 hari/tahun, Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 118 orang. Pabrik KA-Oil ini direncakan berlokasi di Belawan, Kota Medan, Provinsi Sumatera Utara dengan luas tanah 30.000 m2. Sumber air pabrik KA-Oil berasal dari Sungai Pegatalan, Provinsi Sumatera Utara dan untuk memenuhi kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya 5.497 kW.
Hasil analisa ekonomi yang diperoleh sebagai berikut:
1. Fixed Capital Investment (FCI) = Rp.437.952.433.539
2. Working Capital Investment (WCI) = Rp.48.661.381.504
3. Total Capital Investment (TCI) = Rp.486.613.815.043
4. Total Production Cost (TPC) = Rp.318.154.468.146
5. Sales Cost (SC) = Rp.469.024.636.562
6. Laba Bersih = Rp.113.152.626.312
7. POT = 4 tahun
8. Break Event Point (BEP) = 44,5%
9. Rate Of Return (ROR) = 23,25%
10. Internal Rate of Return (IRR) = 24%

This preliminary of KA-Oil factory design using cyclohexane as a raw material with the production capacity is 3.750 ton/year with work day about 340 days of a year. The planned form of company is a Limited Liability Company (Ltd). The factory plant is planned to be established in Belawan, Medan City, North Sumatera Province. The workers needed to run this company amounted to 118 people. The area of land required to set up the factory is 30,000 m2. The water source of the KA-Oil plant comes from the Pegatalan river, North Sumatera Province and the electricity need is obtained from the State Electricity Company (PLN) and the Generator of 5.497 kW. The results of economic analysis are below: 1. Fixed Capital Investment (FCI) = Rp.452.592.433.538 2. Working Capital Investment (WCI) = Rp.50.288.048.171 3. Total Capital Investment (TCI) = Rp.502.880.481.709 4. Total Production Cost (TPC) = Rp.321.388.783.052 5. Sales Cost (SC) = Rp.460.552.697.283 6. Laba Bersih = Rp.104.372.935.673 7. Pay Out Time (POT) = 3 tahun 8. Break Event Point (BEP) = 44 % 9. Internal Rate of Return (IRR) = 24 % 10. Rate Of Return (ROR) = 23 %

Citation