<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="9750">
 <titleInfo>
  <title>PRARANCANGAN UNIT HYDROLIZER PADA PABRIK UREA</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>ATHIRAH</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2014</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRACT&#13;
Preliminary unit design Hydrolyzer using wastewater urea plant as the raw&#13;
material. Hydrolyzer unit’s raw capacity is 35 tons/h with 330 days working days&#13;
per year. Used 36 person as employees. Location for establishing this unit is&#13;
planned in Urea plant’s area, Dewantara districts, North Aceh, Aceh province,&#13;
with area of 15.900 m2. The water resource for the unit Hydrolyzer is will take&#13;
from Peusangan River.&#13;
The results of the economic analysis are obtained as follows:&#13;
a. Fixed Capital Investment = Rp. 275.118.299.579,-&#13;
b. Working Capital Investment = Rp. 48.853.335.590,-&#13;
c. Total Capital Investment = Rp. 323.971.635.169,-&#13;
d. Production Cost per year = Rp. 276.421.066.549,-&#13;
e. The sales per year = Rp. 499.958.205.120,-&#13;
f. Net income per year = Rp. 157.335.917.694,-&#13;
g. Pay Out Time (POT) = 2 tahun 6 bulan&#13;
h. Break even Point (BEP) = 21%&#13;
The conclution based on the result is the preliminary unit Hydrolyzer soap&#13;
noodle is capable for continuing to the construction step.</note>
 <subject authority="">
  <topic>MANUFACTURING - TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>HYDROLYSIS-CHEMICAL ENGINEERING</topic>
 </subject>
 <classification>1</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>9750</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2014-10-16 15:01:16</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2016-02-29 11:53:21</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>