FAKTOR-FAKTOR PENYEBAB TIMBULNYA WASTE MATERIALS DALAM PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI KOTA BANDA ACEH
Pengarang
MUNAUWAR NAWAWI - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1704201010044
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S2) / PDDIKTI : 22101
Subject
Kata Kunci
Penerbit
Banda Aceh : Universitas Syiah Kuala., 2021
Bahasa
Indonesia
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
FAKTOR-FAKTOR PENYEBAB TIMBULNYA WASTE MATERIALS
DALAM PELAKSANAAN PROYEK KONSTRUKSI GEDUNG
DI KOTA BANDA ACEH
Munauwar Nawawi
NIM 1704201010044
Program Studi Magister Teknik Sipil
Jurusan Teknik Sipil - Fakultas Teknik
Universitas Syiah Kuala
Abstrak
Waste materials adalah kondisi penggunaan kuantitas material yang dapat
menimbulkan sisa material atau limbah pada proyek konstruksi. Pada proyek
konstruksi gedung di Kota Banda Aceh banyak ditemui adanya waste materials.
Waste materials yang timbul seperti semen, agregat halus, agregat kasar, besi
tulangan, kayu, triplek, batu bata, cat, keramik, genteng, pipa Poly Vinyl Chloride
(PVC), dan material lainnya. Banyak faktor yang dapat menimbulkan sisa material
antara lain faktor desain, pengadaan material, penanganan material, pelaksanaan,
residual, dan faktor lain-lain. Penelitian ini bertujuan untuk menganalisis faktorfaktor
dan faktor dominan yang menyebabkan timbulnya waste materials dalam
pelaksanaan proyek konstruksi gedung di Kota Banda Aceh. Penelitian ini
menggunakan pendekatan metode kuantitatif melalui penyebaran kuesioner.
Responden ditujukan pada project manager atau site manager dari perusahaan
kontraktor bidang gedung di Provinsi Aceh mulai dari kualifikasi Menengah (M1 dan
M2) dan kualifikasi Besar (B1 dan B2). Jumlah populasi kontraktor sebanyak 1.610,
sedangkan jumlah sampel yang digunakan dalam analisis faktor Principle
Component Analysis (PCA) adalah 5 kali dari 35 indikator yang diamati yaitu
sebanyak 175 perusahaan. Teknik sampling yang digunakan adalah purposive
sampling yaitu pengambilan sampel dengan pertimbangan yang didasarkan pada
perusahaan kontraktor yang telah melaksanakan proyek konstruksi bangunan gedung
di Provinsi Aceh mulai dari tahun 2010-2019 dengan sumber dana yang berasal dari
Anggaran Pendapatan Belanja Kota (APBK). Analisis data digunakan uji validitas,
uji reliabilitas, statistik deskriptif, dan analisis faktor PCA melalui software
Statistical Product and Service Solution (SPSS) versi 26. Hasil penelitian
menunjukkan bahwa faktor-faktor yang menyebabkan timbulnya waste materials
dalam pelaksanaan proyek konstruksi gedung di Kota Banda Aceh terdapat 6 faktor
yaitu faktor desain, pengadaan material, pelaksanaan, spesifikasi dan penanganan
material, residual, dan pengontrolan material dengan total varian sebesar 74,666%.
Faktor yang dominan menyebabkan timbulnya waste materials dalam pelaksanaan
proyek konstruksi gedung di Kota Banda Aceh adalah faktor desain dengan varian
sebesar 36,922%.
Kata Kunci: Material, waste materials, proyek, konstruksi, gedung
FACTORS CAUSING THE EMERGENCE OF WASTE MATERIALS IN
THE IMPLEMENTATION OF BUILDING CONSTRUCTION
PROJECT IN BANDA ACEH CITY
Munauwar Nawawi
Student Number 1704201010044
Master Program of Civil Engineering
Civil Engineering Department of Engineering Faculty
University Syiah Kuala
Abstract
Waste material is a condition of using quantity of material that can cause residual
material or waste in construction projects. In building construction projects in Banda
Aceh City, many waste materials are found. Waste materials that arise are cement,
fine aggregate, coarse aggregate, steel reinforcement, wood, plywood, bricks, paint,
ceramics, roof tiles, Poly Vinyl Chloride (PVC) pipes, and other materials. Many
factors can cause material waste, including design factors, material procurement,
material handling, implementation, residuals, and other factors. This study aims to
analyze the dominant factors and factors that cause the emergence of waste materials
in the implementation of building construction projects in Banda Aceh City. This
study uses a quantitative method approach through the distribution of questionnaires.
Respondents were addressed to project managers or site managers from building
contractor companies in Aceh Province, ranging from medium qualifications (M1
and M2) and major qualifications (B1 and B2). The total population of contractors is
1,610, while the number of samples used in the Principle Component Analysis
(PCA) factor analysis is 5 times of the 35 indicators observed, namely 175
companies. The sampling technique used is purposive sampling, namely sampling
with considerations based on contracting companies that have implemented building
construction projects in Aceh Province from 2010-2019 with the source of funds
coming from the City Revenue and Expenditure Budget (APBK). Data analysis used
validity test, reliability test, descriptive statistics, and PCA factor analysis through
Statistical Product and Service Solution (SPSS) version 26 software. The results
showed that the factors that caused the emergence of waste materials in the
implementation of building construction projects in Banda Aceh City there are 6
factors, namely design factors, material procurement, implementation, material
specifications and handling, residuals, and material control with a total variance of
74.666%. The dominant factor causing the emergence of waste materials in the
implementation of building construction projects in Banda Aceh City is the design
factor with a variance of 36.922%.
Key Words: Materials, waste materials, projects, construction, buildings
Tidak Tersedia Deskripsi
IDENTIFIKASI FAKTOR-FAKTOR PENYEBAB TERJADINYA PEMBOROSAN MATERIAL (MATERIAL WASTE) DALAM PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI KOTA BANDA ACEH (M. Hafidh Kamal, 2016)
FAKTOR-FAKTOR PENYEBAB TIMBULNYA WASTE MATERIALS DALAM PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI KOTA BANDA ACEH (MUNAUWAR NAWAWI, 2021)
FAKTOR-FAKTOR PENERAPAN LEAN CONSTRUCTION PADA PROYEK KONSTRUKSI GEDUNG DI KOTA BANDA ACEH (Zulhelmi Andika, 2022)
FAKTOR-FAKTOR PENYEBAB WASTE MATERIALS DALAM PELAKSANAAN PROYEK REHABILITASI PRASARANA GEDUNG FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA (Adi Bilhak, 2025)
ANALISIS FAKTOR – FAKTOR PENYEBAB KETERLAMBATAN PADA PELAKSANAAN YANG BERDAMPAK TERHADAP WAKTU PENYELESAIAN PROYEK KONSTRUKSI GEDUNG DI KOTA BANDA ACEH. (DARMAWI, 2019)