<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="74175">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Rozzana</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Universitas Syiah Kuala</publisher>
   <dateIssued>2020</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Null</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRAK &#13;
Prarancangan pabrik Bioetanol ini menggunakan sekam padi sebagai bahan baku.&#13;
Kapasitas bahan baku pabrik Bioetanol ini adalah 187.000 ton/tahun dengan hari&#13;
kerja 330 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan&#13;
Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan&#13;
tenaga kerja untuk menjalankan perusahaan ini berjumlah 163 orang. Lokasi&#13;
pabrik direncanakan didirikan di Desa Pante Sikeumbong, Kecamatan Gandapura,&#13;
Kabupaten Bireun, Provinsi Aceh dengan luas tanah 26.400 m&#13;
. Sumber air pabrik&#13;
Bioetanol ini berasal dari Sungai Peusangan, Bireun dan untuk memenuhi&#13;
kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan Generator&#13;
dengan daya 1.822,37 kW.&#13;
&#13;
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut : &#13;
1. Fixed Capital Investment (FCI) &#13;
2&#13;
 &#13;
= Rp.    356.826.783.926,- &#13;
2. Working Capital Investment (WCI) &#13;
= Rp.    91.456.695.981,- &#13;
3. Total Capital Investment (TCI) &#13;
 &#13;
= Rp.   457.283.479.907 ,-  &#13;
4. Total Production Cost (TPC) &#13;
 &#13;
= Rp    741.885.132.801,- &#13;
5. Sales Cost (SC) &#13;
 &#13;
 &#13;
 &#13;
= Rp    917.658.000.000,- &#13;
6. Laba Bersih &#13;
 &#13;
 &#13;
 &#13;
= Rp.   131.829.650.399,- &#13;
7. Pay Out Time (POT) &#13;
 &#13;
 &#13;
= 5 tahun &#13;
8. Break Event Point (BEP)  &#13;
 &#13;
= 37,5 % &#13;
9. Internal Rate of Return (IRR) &#13;
 &#13;
= 22,50 % &#13;
10.      Rate Of Return (ROR) &#13;
 &#13;
 &#13;
= 28,82 % &#13;
&#13;
</note>
 <classification>0</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>74175</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2020-07-22 20:45:52</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2020-07-23 09:52:09</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>