PERENCANAAN BIAYA MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG BPJN (BALAI PELAKSANA JALAN NASIONAL) TAHAP III
Pengarang
Muhammad Ricci Akbar - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1204101010125
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201
Subject
Kata Kunci
Penerbit
Banda Aceh : Universitas Syiah Kuala., 2019
Bahasa
Indonesia
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Tugas Akhir Sarjana
PERENCANAAN BIAYA MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG BPJN (BALAI PELAKSANA JALAN NASIONAL) TAHAP III
Muhammad Ricci Akbar
NIM.1204101010125
Program Studi Sarjana Teknik Sipil
Jurusan Teknik Sipil-Fakultas Teknik
Universitas Syiah Kuala
Abstrak
Proyek merupakan kegiatan yang bersifat sementara, tidak berulang, tidak bersifat rutin, mempunyai waktu awal dan akhir, sumber daya terbatas, dan dimaksudkan untuk mencapai sasaran yang ditentukan. Kontraktor harus menyediakan modal kerja, karena sangat berpengaruh terhadap pekerjaan konstruksi. Penaksiran anggaran biaya adalah proses perhitungan volume pekerjaan, harga dari berbagai macam bahan dan pekerjaan yang akan terjadi pada suatu konstruksi. Permasalahan dalam penelitian ini adalah berapa banyak bahan atau material yang diperlukan untuk Pembangunan Proyek Gedung BPJN Tahap III-Banda Aceh. Penelitian ini bertujuan untuk menghitung jumlah material yang diperlukan untuk Pembangunan Proyek Gedung BPJN Tahap III-Banda Aceh. perencanaan atau perhitungan biaya material dan jumlah material berdasarkan Analisa Harga Satuan Pekerjaan (AHSP) 2016. Data yang dibutuhkan dalam penelitian ini berupa data sekunder. Rencana hasil penelitian ini adalah perencanaan biaya material yang dibutuhkan dalam pembangunan proyek gedung BPJN Tahap III-Banda Aceh. Manfaat dari penelitian ini adalah sebagai masukan dalam merencanakan bahan dan biaya material dalam pelaksanaan pembangunan proyek gedung di masa yang akan datang
Kata Kunci: Proyek, Konstruksi, Material, Gedung BPJN
Undergraduate Final Project
MATERIAL COST PLANNING IN THE PHASE III BPJN (BALAI PELAKSANA JALAN NASIONAL) BUILDING CONSTRUCTION PROJECT
M. Ricci Akbar
1204101010125
Undergraduate Program of Civil Engineering
Civil Engineering Department of Engineering Faculty
Syiah Kuala University
Abstract
Projects are temporary, non-repetitive, non-routine activities, have a start and end time, have limited resources, and are supportive of achieving the specified targets. The contractor must provide working capital, because it is very important for construction work. Cost budgeting is the process of calculating the volume of work, the price of various materials and the work that will occur in a construction. The problem in this research is the large amount of material needed for the Phase III BPJN Building Construction Project-Banda Aceh. This research is needed to calculate the amount of material needed for the Phase III-Banda Aceh BPJN Building Project Development. Planning or calculation of material costs and the amount of material based on the 2016 Job Unit Price Analysis (AHSP). The data needed in this study is secondary data. The plan of the results of this research is the planning of material costs needed in the planning of building the BPJN Phase III-Banda Aceh building. The benefits of this research will be input into planning materials and material costs in future project development plans.
Keywords: Project, Construction, Material, BPJN Building
Tidak Tersedia Deskripsi
ANALISIS LIFE CYCLE COST PADA PROYEK PEMBANGUNAN GEDUNG PENGADILAN TINGGI BANDA ACEH (Sutan Pratama Risman, 2025)
PROPORSI BIAYA SUMBER DAYA MANUSIA, MATERIAL DAN ALAT PADA PROYEK KONSTRUKSI JALAN (BERRIL MUFARDIS, 2019)
EVALUASI EFISIENSI BIAYA DENGAN METODE REKAYASA NILAI PADA PROYEK PEMBANGUNAN GEDUNG PELAYANAN TERPADU PELABUHAN PERIKANAN SAMUDRA (Erwin Juanda, 2017)
PERENCANAAN KEBUTUHAN MATERIAL PADARNPROYEK PEMBANGUNAN ASRAMA 2 LANTAIRNBARU DAN LANJUTAN ASRAMA LANTAI 3 DAYAHRNBABUSSALAM AL-AZIZIYAH PUTRA (MUHAMMAD FURQAN, 2022)
ANALISIS KEBUTUHAN DAN BIAYA MATERIAL PROYEK PEMBANGUNAN MIN 8 BANDA ACEH (AULIA SANI, 2024)