PENJADWALAN KEBUTUHAN TENAGA KERJA PADA PROYEK GEDUNG BPJN TAHAP I BANDA ACEH
Pengarang
Mhd Andika Prakarsa - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1204101010145
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201
Subject
Kata Kunci
Penerbit
Banda Aceh : Universitas Syiah Kuala., 2019
Bahasa
Indonesia
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Tugas Akhir Sarjana
PENJADWALAN KEBUTUHAN TENAGA KERJA PADA
PROYEK GEDUNG BPJN TAHAP I BANDA ACEH
Mhd Andika Prakarsa
NIM.1204101010145
Program Studi Sarjana Teknik Sipil
Jurusan Teknik Sipil-Fakultas Teknik
Universitas Syiah Kuala
Abstrak
Proyek konstruksi merupakan pekerjaan yang memiliki karakteristik unik yang tidak berulang, di mana proses yang terjadi pada suatu proyek tidak dapat berulang pada proyek lainnya. Untuk penyelenggaraan proyek pembangunan tersebut, salah satu sumber daya yang menjadi faktor penentu keberhasilannya adalah faktor tenaga kerja. Dalam pemakaian tenaga kerja diperlukan adanya perencanaan yang erat kaitannya dengan penjadwalan. Penelitian jadwal tenaga kerja ini dilatarbelakangi oleh sering terjadinya keterbatasan jumlah tenaga kerja sehingga menyebabkan keterlambatan proyek secara keseluruhan. Tujuan dari penelitian adalah untuk mendapatkan penggunaan tenaga kerja pada setiap item pekerjaan per minggu. Studi kasus pada pembangunan ini adalah proyek gedung BPJN tahap I Banda Aceh. Pembangunan dimulai dengan penjadwalan. Proses penjadwalan tercakup penguraian komponen pekerjaan, penentuan durasi, perkiraan jumlah tenaga kerja tiap item pekerjaan. Hubungan antar kegiatan, serta analisis alokasi kebutuhan tenaga kerja. Pengumpulan data berupa data sekunder. Hasil dari penelitian ini jumlah kebutuhan maksimum pekerja adalah 158 orang pada minggu ke-16 pada pekerjaan perakitan.
Kata Kunci : Proyek Konstruksi, Penjadwalan Proyek dan Tenaga Kerja
Final Project
SCHEDULING OF LABOR REQUIREMENT ON
BPJN BUILDING PROJECT STAGE I BANDA ACEH
Mhd Andika Prakarsa
NIM.1204101010145
Department of Civil Engineering
Faculty of Engineering
Syiah Kuala University
Abstract
Construction projects are jobs that have unique characteristics that are not repeated, in which the processes that occur in one project cannot be repeated in other projects. For the implementation of the development project, one of the resources that determines its success is the labor factor. In using labor, planning is needed which is closely related to scheduling. Research on the workforce schedule is motivated by the frequent occurrence of limited workforce, which causes overall project delays. The aim of the study is to obtain labor usage on each work item per week. Case study in this development is the BPJN building project phase I Banda Aceh. Construction begins with scheduling. The scheduling process involves breaking down the work components, determining the duration, estimated number of workers for each work item. Relationships between activities, as well as analysis of allocation of workforce needs. Data collection in the form of secondary data. The results of this study the maximum number of workers needed is 158 people in the 16th week of assembly work.
Keywords : Construction Projects, Project Scheduling and Labor
Tidak Tersedia Deskripsi
PERENCANAAN JADWAL TENAGA KERJA PADA PROYEK PEMBANGUNAN GEDUNG BPJS KESEHATAN KANTOR CABANG LANGSA (Rohmat Prihanto, 2020)
PENJADWALAN TENAGA KERJA PADA PROYEK GEDUNG DINAS PERHUBUNGAN KOTA BANDA ACEH (Andalia, 2024)
PERENCANAAN KEBUTUHAN TENAGA KERJA DENGAN MENGGUNAKAN APLIKASI MICROSOFT PROJECT (Surya Ningsih, 2024)
PERENCANAAN BIAYA MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG BPJN (BALAI PELAKSANA JALAN NASIONAL) TAHAP III (Muhammad Ricci Akbar, 2019)
PERENCANAAN PENJADWALAN DENGAN MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM)
(STUDI KASUS PADA PROYEK PEMBANGUNAN GEDUNG SEKOLAH DASAR NEGERI 62 COT MESJID KOTA BANDA ACEH) (Faisal, 2024)