  <title>PENJADWALAN KEBUTUHAN TENAGA KERJA PADA PROYEK GEDUNG BPJN TAHAP I BANDA ACEH</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Mhd Andika Prakarsa</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Universitas Syiah Kuala</publisher>
   <dateIssued>2019</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Null</form>
  <extent></extent>
 </physicalDescription>
 <note>Tugas Akhir Sarjana&#13;
&#13;
PENJADWALAN KEBUTUHAN TENAGA KERJA PADA&#13;
PROYEK GEDUNG BPJN TAHAP I BANDA ACEH&#13;
Mhd Andika Prakarsa&#13;
NIM.1204101010145&#13;
Program Studi Sarjana Teknik Sipil&#13;
Jurusan Teknik Sipil-Fakultas Teknik&#13;
Universitas Syiah Kuala&#13;
&#13;
&#13;
Abstrak&#13;
&#13;
Proyek konstruksi merupakan pekerjaan yang memiliki karakteristik unik yang tidak berulang, di mana proses yang terjadi pada suatu proyek tidak dapat berulang pada proyek lainnya. Untuk penyelenggaraan proyek pembangunan tersebut, salah satu sumber daya yang menjadi faktor penentu keberhasilannya adalah faktor tenaga kerja. Dalam pemakaian tenaga kerja diperlukan adanya perencanaan yang erat kaitannya dengan penjadwalan. Penelitian jadwal tenaga kerja ini dilatarbelakangi oleh sering terjadinya keterbatasan jumlah tenaga kerja sehingga menyebabkan keterlambatan proyek secara keseluruhan. Tujuan dari penelitian adalah untuk mendapatkan penggunaan tenaga kerja pada setiap item pekerjaan per minggu. Studi kasus pada pembangunan ini adalah proyek gedung BPJN tahap I Banda Aceh. Pembangunan dimulai dengan penjadwalan. Proses penjadwalan tercakup penguraian komponen pekerjaan, penentuan durasi, perkiraan jumlah tenaga kerja tiap item pekerjaan. Hubungan antar kegiatan, serta analisis alokasi kebutuhan tenaga kerja. Pengumpulan data berupa data sekunder. Hasil dari penelitian ini jumlah kebutuhan maksimum pekerja adalah 158 orang pada minggu ke-16 pada pekerjaan perakitan.&#13;
&#13;
Kata Kunci : Proyek Konstruksi, Penjadwalan Proyek dan Tenaga Kerja&#13;
&#13;
Final Project&#13;
&#13;
SCHEDULING OF LABOR REQUIREMENT ON&#13;
BPJN BUILDING PROJECT STAGE I BANDA ACEH&#13;
Mhd Andika Prakarsa&#13;
NIM.1204101010145&#13;
Department of Civil Engineering&#13;
Faculty of Engineering&#13;
Syiah Kuala University&#13;
&#13;
&#13;
Abstract&#13;
&#13;
Construction projects are jobs that have unique characteristics that are not repeated, in which the processes that occur in one project cannot be repeated in other projects. For the implementation of the development project, one of the resources that determines its success is the labor factor. In using labor, planning is needed which is closely related to scheduling. Research on the workforce schedule is motivated by the frequent occurrence of limited workforce, which causes overall project delays. The aim of the study is to obtain labor usage on each work item per week. Case study in this development is the BPJN building project phase I Banda Aceh. Construction begins with scheduling. The scheduling process involves breaking down the work components, determining the duration, estimated number of workers for each work item. Relationships between activities, as well as analysis of allocation of workforce needs. Data collection in the form of secondary data. The results of this study the maximum number of workers needed is 158 people in the 16th week of assembly work.&#13;
&#13;
Keywords : Construction Projects, Project Scheduling and Labor&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
</note>
 <classification>0</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>62058</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2019-08-30 11:05:49</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2019-08-30 11:17:55</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>