<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="54009">
 <titleInfo>
  <title>PENINGKATAN BIMS 2018 TERHADAP SISTEM MANAJEMEN KESELAMATAN PERTAMBANGAN MINERAL DAN BATUBARA (SMKP MINERBA) MENGGUNAKAN METODE GAP ANALISIS DI PT BARA ENERGI LESTARI</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>FRIANGCHA AYU H</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Universitas Syiah Kuala</publisher>
   <dateIssued>2019</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Null</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRAK&#13;
&#13;
PT Bara Energi Lestari adalah perusahaan yang bergerak di bidang pertambangan batubara yang terletak di Gampong Seumambek Kecamatan Suka Makmue, Kabupaten Nagan Raya, Provinsi  Aceh. PT BEL memiliki sistem manajemen terintegrasi yang lebih dikenal dengan BEL Integrated Management System (BIMS).  BIMS  mengadopsi  empat  sistem  manajemen,  yaitu  ISO  9001,  ISO&#13;
14001,  OHSAS  18001,  dan  SMKP  Minerba.  Gap  Analysis  salah  satu  acuan BIMS, yaitu analisis untuk menghitung persentase pemenuhan BIMS terhadap penerapan SMKP Minerba. Tujuan penelitian untuk mengetahui hasil temuan Gap Analysis pemenuhan BIMS terhadap penerapan SMKP Minerba. Penelitian dilakukan dengan tanya jawab kepada karyawan PT BEL berupa data Self Assessment SMKP Minerba yang mencakup ke tujuh elemen SMKP Minerba, yaitu Kebijakan, Perencanaan, Organisasi dan Personel, Implementasi, Evaluasi dan Tindak Lanjut, Dokumentasi dan Tinjauan Manajemen. Hasil Gap Analysis menunjukkan pencapaian BIMS terhadap SMKP adalah 87,37% dan memiliki hasil temuan sebanyak 91 temuan. Temuan terbanyaknya mengenai pengelolaan Keselamatan Operasional Pertambangan dan pengawas teknik belum menjalankan tugas  sebagaimana  mestinya,  dan  belum  adanya  tenaga  teknik  yang berkompetensi. Selain itu, direkomendasikan juga dua kegiatan untuk temuan mayor yaitu membuat dokumen TSP Pada Section TSE belum ada dan belum approval,  dan  menyelesaikan  dan  melengkapi  prosedur  kerja,  standar  dan instruksi kerja Section MNE, TSE, dan HSE untuk memenuhi temuan mayor.&#13;
&#13;
&#13;
&#13;
Kata Kunci: BIMS, SMKP Minerba, Gap Analysis, Temuan. &#13;
&#13;
ABSTRACT&#13;
&#13;
&#13;
PT Bara Energi Lestari is a company engaged in coal mining that is located in Gampong Seumambek, Suka Makmue District, Nagan Raya Regency, Aceh Province. PT BEL has an integrated management system better known as BEL Integrated Management System (BIMS). BIMS adopts four management systems, namely ISO 9001, ISO 14001, OHSAS 18001, and SMKP Minerba. Gap Analysis is one of the references of BIMS, namely analysis to calculate the percentage of fulfillment of BIMS towards the application of SMKP Minerba. The research objective  was  to  find  out  the  findings  of  the  Gap  Analysis  towards  BIMS fulfillment on SMKP Minerba implementation. The study is conducted by questioning PT BEL employees in the form of Self Assessment of SMKP Minerba which includes the seven elements of SMKP Minerba, namely Policy, Planning, Organization and Personnel, Implementation, Evaluation and Follow-Up, Management Documentation and Review. The Gap Analysis results show that the achievement of BIMS on SMKP is 87,37% and has findings of 91 findings. The most findings are the management of Mining Operational Safety and technical supervisors have not carried out their duties properly, and the lack of competent technical personnel. In addition, two major findings are also found, namely composing TSP documents in the TSE Section thatis not yet available and not approval, completing and completing work procedures, standards and Section MNE, TSE, and HSE work instructions to fulfill major findings.&#13;
&#13;
&#13;
Keywords: BIMS, SMKP Minerba, Gap Analysis, Findings. &#13;
</note>
 <classification>0</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>54009</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2019-01-28 14:09:28</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2019-01-28 15:14:12</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>