PERENCANAAN PERAWATAN MESIN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA MESIN CONVEYOR AREA BATCHING PLANT BETON (STUDI KASUS DI PT. LHOKNGA BETON)
Pengarang
Abdul Fauzan Darkita - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1304106010012
Fakultas & Prodi
Fakultas Teknik / Teknik Industri (S1) / PDDIKTI : 26201
Subject
Kata Kunci
Penerbit
Banda Aceh : Universitas Syiah Kuala., 2019
Bahasa
Indonesia
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Perencanaan Perawatan Mesin Menggunakan Metode Reliability Centered Maintenance pada Mesin Conveyor Area Batching Plant Beton
(Studi Kasus : PT Lhoknga Beton, Lhoknga – Aceh Besar)
ABSTRAK
Perawatan Mesin merupakan suatu tindak pemeliharaan terhadap aset yang dimiliki oleh perusahaan untuk memastikan aset selalu dalam kondisi terbaik. PT Lhoknga Beton merupakan perusahaan konstruksi yang memproduksi beton siap pakai. Pada proses perawatan aset yang dimiliki, PT Lhoknga Beton masih menggunakan metode Breakdown Maintenance sehingga sangat mengganggu proses produksi karena mesin sering mengalami downtime. Untuk meminimalisir tingkat terjadinya downtime mesin maka dilakukan perbaikan terhadap tindak pemeliharaan aset yang dimiliki oleh perusahaan menggunakan metode Reliability Centered Maintenance (RCM) yang bertujuan untuk memberikan rekomendasi tindak pemeliharaan mesin melalui Maintenance Task. Mode-mode kegagalan potensial dan penyebabnya dianalisis menggunakan Failure Mode and Effect Analysis (FMEA) yang selanjutnya dilakukan perhitungan Risk Priority Number (RPN), nilai RPN didapatkan dengan memberikan skor terhadap mode-mode kegagalan potensial yang terjadi, dimana nilai tersebut akan diolah untuk menentukan Maintenance Task yang sesuai dengan jenis kegagalan yang terjadi. Diagram Pareto digunakan untuk melihat frekuensi terjadinya kegagalan dari yang paling tinggi hingga yang terendah. Maintenance Task merupakan output dari proses RCM yang akan memberikan rekomendasi tindak pemeliharaan yang tepat terhadap aset prusahaan.
Kata Kunci: Perawatan Mesin, Breakdown Maintenance, Reliability Centered Maintenance, Maintenance Task, Failure Mode and Effect Analysis, Risk Priority Number
Machine Maintenance Planning Using Reliability Centered Maintenance Method on Conveyor Plant in Batching Plant Concrete Area
(Case Study: PT Lhoknga Beton, Lhoknga - Aceh Besar)
ABSTRACT
Maintenance Machine is a maintenance act against assets owned by the company to ensure the assets are always in the best condition. PT Lhoknga Beton is a construction company producing ready-made concrete. In the process of asset maintenance owned, PT Lhoknga Beton still use Breakdown Maintenance method so it is very disturbing the production process because the machine often experience downtime. To minimize the rate of machine downtime, an improvement on the maintenance of assets owned by the company using Reliability Centered Maintenance (RCM) method is aimed to give recommendation of machine maintenance through Maintenance Task. The potential failure modes and their causes are analyzed using the Failure Mode and Effect Analysis (FMEA) which is then calculated Risk Priority Number (RPN), the RPN value obtained by scoring the potential failure modes that occur, where the value will be processed to determine Maintenance Task that match the type of failure that occurred. Pareto diagram used to see the frequency of failure from the highest to the lowest. Maintenance Task is an output of the RCM process that will provide recommendations of appropriate maintenance actions against the company's assets.
Keywords: Machine Treatment, Breakdown Maintenance, Reliability Centered Maintenance, Maintenance Task, Failure Mode and Effect Analysis, Risk Priority Number
Tidak Tersedia Deskripsi
PERENCANAAN PENJADWALAN MAINTENANCE UNTUK RNMENINGKATKAN KEANDALAN PADA LINI PENGEMASAN RNDENGAN MENGGUNAKAN METODE RNRELIABILITY CENTERED MAINTENANCE (RCM) RN(STUDI KASUS: PT. MAXMASTER INDONESIA MEDAN) (ALIF ALWANDA, 2025)
ANALISA BELT CONVEYOR PADA SISTEM COAL HANDLING MILIK PLTU. SUMBER SEGARA PRIMADAYA MENGGUNAKAN METODE REABILITY CENTERED MAINTENANCE (RCM) (Tamara Hekmatyar, 2018)
PENINGKATAN PRODUKTIVITAS DENGAN SISTEM MANAJEMEN PERAWATAN (Firdaus, 2024)
PENERAPAN LEAN DAN GREEN MANUFACTURING PADA PLANT PRODUKSI READY MIX CONCRETE (STUDI KASUS: PT. LHOKNGA BETON) (Rahmad Rizki Karunia, 2019)
PERENCANAAN PENJADWALAN PERBAIKAN UNTUK MENINGKATKAN KEANDALAN PADA MESIN CNC PLASMA CUTTING DENGAN MENGGUKANAN METODE RELIABILITY CENTERED MAINTENANCE(RCM) (STUDI KASUS CV. HILUX 57 STEEL) (KHAIRUL MULUK, 2026)