<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="43071">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>M. Furqan Adhi</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA</publisher>
   <dateIssued>2018</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRAK&#13;
Prarancangan pabrik susu bubuk kacang hijau ini menggunakan kacang hijau sebagai&#13;
bahan baku utama. Kapasitas bahan baku pabrik susu bubuk kacang hijau ini adalah&#13;
10.000  ton  per  tahun  dengan  hari  kerja  300  hari  dan  24  jam perhari.  Bentuk&#13;
perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan&#13;
metode struktur garis dan staff.  Tenaga kerja yang dibutuhkan untuk menjalankan&#13;
perusahaan ini berjumlah 150 orang. Lokasi pabrik direncanakan didirikan di Kec.&#13;
Sawang,  Kab.  Aceh  Utara,  Prov.  Aceh dengan luas  tanah 26.400 m&#13;
.  Sumber  air&#13;
pabrik ini  berasal  dari  sungai  krueng Sawang dengan total  kebutuhan air  sebesar&#13;
188.188,7  Kg/jam.  Sedangkan kebutuhan listrik diperoleh dari  Generator  dengan&#13;
daya 720,26 kW.&#13;
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:&#13;
1. Fixed Capital Investment =  Rp. 178.612.265.847,39&#13;
2. Working Capital Investment =  Rp. 52.533.019.366,88&#13;
3. Total Capital Investment =  Rp. 353.220.129.112,52&#13;
4. Total Biaya Produksi =  Rp. 273.369.142.138,10&#13;
5. Hasil Penjualan =  Rp. 1.765.979.960.400&#13;
6. Laba Bersih =  Rp. 61.975.323.087,50&#13;
7. Internal Rate of Return (IRR)          =  21,7%&#13;
8. Break Even Point (BEP)                           =  39,09 %&#13;
9. Pay Out Time (POT)              =  2 tahun 9 bulan&#13;
Berdasarkan studi kelayakan teknis dan ekonomis di atas, maka dapat disimpulkan&#13;
bahwa prarancangan pabrik susu bubuk kacang hijau ini layak untuk dilanjutkan ke&#13;
tahap rancangan.&#13;
8&#13;
2&#13;
ABSTRACT&#13;
Milk  powder  plant  design  uses  mung  bean  as  the  main  raw material.  The  raw&#13;
material capacity of this mung bean powdered milk plant is 10,000 tons per year with&#13;
300 working days and 24 hours per day. The company's form is Limited Company&#13;
(PT) using line structure method and staff, with 150 people to run this company. This&#13;
plant will be established in Kec. Sawang, Kab. Aceh Utara, Prov. Aceh on 26,400 m2&#13;
of area . The water source of this plant comes from Krueng Sawang river with total&#13;
water requirement of 188,7 Kg / hour. While the electricity needs is obtained from&#13;
Generator with 720,26 kW power.&#13;
The results of economic analysis obtained are as follows:&#13;
1. Fixed Capital Investment = Rp. 178.612.265.847,39&#13;
2. Working Capital Investment = Rp. 52.533.019.366,88&#13;
3. Total Capital Investment = Rp. 353.220.129.112,52&#13;
4. Total Production Cost = Rp. 273.369.142.138,10&#13;
5. Sales Results = Rp. 1.765.979.960.400&#13;
6. Net Income = Rp. 61.975.323.087,50&#13;
7. Internal Rate of Return (IRR) = 21.7%&#13;
8. Break Even Point (BEP) = 39.09%&#13;
9. Pay Out Time (POT) = 2 years 9 months&#13;
Based  on  the   technical  and  economical  feasibility  studies,  concluded  that  the&#13;
preparation of this mung bean milk powder plant is feasible to the design stage.&#13;
9</note>
 <subject authority="">
  <topic>MILK - PROCESSING</topic>
 </subject>
 <classification>1</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>43071</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2018-07-07 15:04:41</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2019-02-20 08:56:45</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>