Electronic Theses and Dissertation
Universitas Syiah Kuala
NULL
KAJIAN HAZARDS IDENTIFICATION RISK ASSESSMENT DETERMINING CONTROL (HIRADC) TERHADAP PEMENUHAN BEL INTEGRATED MANAGEMENT SYSTEM (BIMS DI PT BARA ENERGI LESTARI KAJIAN HAZARDS IDENTIFICATION RISK ASSESSMENT DETERMINING CONTROL (HIRADC) TERHADAP PEMENUHAN BEL INTEGRATED MANAGEMENT SYSTEM (BIMS) DI PT BARA ENERGI LESTARI
Pengarang
Ardhalita Lovyana - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
1304108010031
Fakultas & Prodi
Fakultas Teknik / Teknik Pertambangan (S1) / PDDIKTI : 31201
Subject
Kata Kunci
Penerbit
Banda Aceh : Universitas Syiah Kuala., 2018
Bahasa
Indonesia
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
ABSTRAK
PT Bara Energi Lestari memiliki suatu sistem manajemen terintegrasi yang diberi nama BEL Integrated Management System (BIMS) dimana BIMS ini mewajibkan setiap section di perusahaan memiliki HIRADC sebagai upaya untuk mencegah terjadinya kecelakaan kerja dan penyakit akibat kerja (PAK). Tujuan penelitian ini adalah mengkaji HIRADC terhadap BIMS Master List Document untuk melihat sejauh mana pemenuhan BIMS sudah dilakukan oleh PT Bara Energi Lestari. Penelitian ini dilakukan dengan metode penelitian kualitatif, data yang digunakan dalam penelitian ini adalah data hasil observasi lapangan dan data hasil wawancara kepada karyawan PT Bara Energi Lestari. Hasil dari penelitian menunjukan bahwa persentase penilaian pemenuhan BIMS sebesar 77 %. Persentasi penilaian ini ditentukan berdasarkan temuan pada HIRADC setiap section yang ada di PT Bara Energi Lestari. Total temuan yang didapatkan adalah 89 temuan, yaitu pada HRGA section ditemukan sebanyak 9 temuan (persentase pemenuhan 82%), HSE Section ditemukan sebanyak 19 temuan (persentase pemenuhan 89%), MNE Section ditemukan sebanyak 29 temuan (persentase pemenuhan 25%), TSE Section ditemukan sebanyak 17 temuan (persentase pemenuhan 51%), CML Section ditemukan sebanyak 12 temuan (persentase pemenuhan 46%), SCM Section ditemukan sebanyak 2 temuan (persentase pemenuhan 94%), serta IRGR Section sebanyak 1 temuan (persentase pemenuhan 50%). Dokumen-dokumen seperti prosedur, standar, dan instruksi kerja tidak tersedia diperusahaan.
Kata Kunci : HIRADC, BIMS, prosedur, standar, instruksi kerja
ABSTRACT
PT Bara Energi Lestari has an integrated management system called BEL Integrated Management System (BIMS) in which BIMS requires each section in the company to have HIRADC as an effort to prevent workplace injury and Occupational Diseases. The purpose of this study is to assess the HIRADC to BIMS Document Master List to see the extent of fulfillment of the BIMS has been done by PT Bara Energi Lestari. This study were conducted using qualitative research method. The data used in this study is the results of field observation and interview which had been done at PT Bara Energi Lestari. This study showed that percentage of scoring fulfillment of BIMS is 77%, because based on HIRADC 89 findings have been obtained, HRGA section found 9 findings (82%), HSE Section found 19 findings (89%), MNE Section found 29 findings (25%), TSE Section found 17 findings (51%), CML Section found 12 findings (46%), SCM Section found 2 findings (94%), and IRGR Section found 1 finding (50%). The documents such as procedures, standards, and work instructions are unavailable.
Keywords: HIRADC, BIMS, Procedures, Standards, Work Instructions
Tidak Tersedia Deskripsi
PENINGKATAN BIMS 2018 TERHADAP SISTEM MANAJEMEN KESELAMATAN PERTAMBANGAN MINERAL DAN BATUBARA (SMKP MINERBA) MENGGUNAKAN METODE GAP ANALISIS DI PT BARA ENERGI LESTARI (FRIANGCHA AYU H, 2019)
PENINGKATAN SISTEM MANAJEMEN KESELAMATAN PERTAMBANGAN MINERAL DAN BATUBARA (SMKP MINERBA) MELALUI PENERAPAN ELEMEN IMPLEMENTASI PADA OPERASI PRODUKSI BATUBARA DI PT BARA ENERGI LESTARI (SALSABILLA ZUHRA, 2018)
KAJIAN GAP ANALYSIS PENERAPAN BARA ENERGI LESTARI INTEGRATED MANAGEMENT SYSTEM TERHADAP SISTEM MANAJEMEN KESELAMATAN PERTAMBANGAN MINERAL BATUBARA (Dora Amalia, 2018)
ANALISIS POTENSI BAHAYA YANG TERDAPAT PADA PROSES PRODUKSI BATUBARA PT BARA ENERGI LESTARI DI KECAMATAN SUKA MAKMUE, KABUPATEN NAGAN RAYA (Raudhatul Nabila, 2024)
THE EFFECT OF ENVIRONMENT CONTROL, RISK ASSESSMENT AND MONITORING ON THE PREVENTION OF FRAUD (A SURVEY AT DINAS PENDIDIKAN ACEH PROVINCE) (Muyassir Kahar, 2019)