<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="39030">
 <titleInfo>
  <title>PENGARUH FAKTOR-FAKTOR KINERJA KONTRAKTOR TERHADAP CAPAIAN MUTU PRESERVASI JALAN SECARA LONG SEGMENT DI PROVINSI ACEH</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>ABD. CHALID</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Program Studi Magister Teknik Sipil Universitas Syiah Kuala</publisher>
   <dateIssued>2018</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Theses</form>
  <extent></extent>
 </physicalDescription>
 <note>PENGARUH FAKTOR-FAKTOR KINERJA KONTRAKTOR TERHADAP&#13;
CAPAIAN MUTU PRESERVASI JALAN SECARA LONG SEGMENT  &#13;
DI PROVINSI ACEH&#13;
 &#13;
v&#13;
 &#13;
Oleh:&#13;
Abd. Chalid &#13;
NIM. 1509200060115&#13;
Komisi Pembimbing: &#13;
1. Dr. Ir. M. Isya, MT&#13;
2. Dr. Hafnidar A. Rani, ST, MM &#13;
 &#13;
ABSTRAK &#13;
Jalan nasional di Provinsi Aceh sering dihadapkan pada permasalahan kerusakan&#13;
sebelum desain umur rencana atau capaian mutunya tidak terpenuhi. Dampak dari&#13;
kerusakan jalan ini sangat berhubungan erat antara kinerja kontraktor dengan capaian&#13;
mutu. Kerusakan jalan tersebut dapat diakibatkan kurang tepatnya strategi preservasi&#13;
jalan. Program preservasi yang tepat pada suatu jalan, dapat melayani penggunanya&#13;
sesuai dengan umur rencana. Penelitian ini bertujuan untuk menganalisis hubungan&#13;
dan pengaruh antara faktor-faktor kinerja kontraktor terhadap capaian mutu&#13;
preservasi jalan, serta mengindentifikasi faktor dominan pada kinerja kontraktor&#13;
yang mempengaruhi capaian mutu preservasi jalan di Provinsi Aceh. Penelitian ini&#13;
menggunakan metode kualitatif dan kuantitatif melalui penyebaran kuesioner,&#13;
dimana respondennya ditujukan pada 15 PPK, 15 general superitendent dan 13 site&#13;
engineer dengan total sebanyak 43 responden. Pihak tersebut mempunyai&#13;
keterlibatan langsung dalam pekerjaan preservasi jalan mulai dari tahun 2016-2017.&#13;
Variabel bebas dalam penelitian ini adalah faktor-faktor kinerja kontraktor yang&#13;
terdiri dari faktor tenaga kerja, material, peralatan, metode kerja, dan standar uji&#13;
mutu, sedangkan varibel terikatnya adalah capaian mutu preservasi jalan. Hasil&#13;
penelitian menunjukkan bahwa faktor tenaga kerja, material, peralatan, dan standar&#13;
uji mutu mempunyai hubungan yang rendah, sementara faktor metode kerja&#13;
mempunyai hubungan yang cukup terhadap capaian mutu preservasi jalan di Provinsi&#13;
Aceh. Faktor-faktor kinerja kontraktor secara simultan berpengaruh signifikan&#13;
terhadap capaian mutu preservasi jalan di Provinsi Aceh sebesar 56,3%. Faktor&#13;
dominan pada kinerja kontraktor yang mempengaruhi capaian mutu preservasi jalan&#13;
di Provinsi Aceh, adalah faktor standar uji mutu. Hal ini menunjukkan bahwa bila&#13;
faktor standar uji mutu dapat ditingkatkan oleh kontraktor, maka capaian mutu&#13;
preservasi jalan akan semakin meningkat.&#13;
&#13;
Kata Kunci: Kinerja kontraktor, preservasi jalan, long segment, Provinsi Aceh &#13;
 &#13;
THE EFFECT OF CONTRACTOR PERFORMANCE FACTORS ON THE&#13;
QUALITY OF PRESERVATION LONG SEGMENT &#13;
IN ACEH PROVINCE&#13;
 &#13;
vi&#13;
 &#13;
By:&#13;
Abd. Chalid &#13;
Student Reg. No. 1509200060115&#13;
Committee of Supervisor: &#13;
1. Dr. Ir. M. Isya, MT&#13;
2. Dr. Hafnidar A. Rani, ST, MM &#13;
 &#13;
ABSTRACT &#13;
National roads in Aceh Province are often faced with damage problems before&#13;
design age or quality plans are not met. The impact of this road damage is closely&#13;
linked between contractor performance and quality performance. Damage to the road&#13;
can be caused precisely the strategy of road preservation. Proper preservation&#13;
program on a road, can serve its users according to the age of the plan. This study&#13;
aims to analyze the relationship and influence between contractor performance&#13;
factors to the achievement of road preservation quality, and to identify the dominant&#13;
factors on contractor performance that influence the achievement of road&#13;
preservation quality in Aceh Province. This study used qualitative and quantitative&#13;
methods through questionnaires distribution, where the respondents addressed to 15&#13;
KDP, 15 general superitendent and 13 site engineer with a total of 43 respondents.&#13;
The party has direct involvement in road preservation work from 2016-2017. The&#13;
independent variables in this research are contractor performance factors which&#13;
consist of labor factor, material, equipment, work method, and quality test standard,&#13;
while the dependent variable is the achievement of road preservation quality. The&#13;
results showed that labor force, materials, equipment, and quality assurance&#13;
standards have low relation, while work method factors have a sufficient relation to&#13;
road preservation quality achievement in Aceh Province. Contractor performance&#13;
factors simultaneously have a significant effect on the achievement of road&#13;
preservation quality in Aceh Province by 56.3%. The dominant factor in contractor&#13;
performance affecting road preservation quality achievement in Aceh Province is the&#13;
factor of quality standard test. This suggests that if the standard factor of the quality&#13;
test can be improved by the contractor, then the achievement of road preservation&#13;
quality will increase.&#13;
&#13;
Key words: Contractor performance, road preservation, long segment, Aceh &#13;
Province</note>
 <subject authority="">
  <topic>ROAD MAINTENANCE</topic>
 </subject>
 <subject authority="">
  <topic>ROADS - ENGINEERING</topic>
 </subject>
 <classification>625.761</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>39030</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2018-03-20 13:10:53</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2018-12-31 10:33:20</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>