<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="33472">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Khaliful Ichsan</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA</publisher>
   <dateIssued>2017</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRAK&#13;
Prarancangan pabrik pupuk ZA ini menggunakan proses netralisasi dengan&#13;
bahan baku amoniak, asam sulfat dan udara. Kapasitas produksi Pabrik Pupuk ZA&#13;
ini adalah 140.000 Ton/Tahun dengan hari kerja 330 hari/tahun. Bentuk perusahaan&#13;
yang direncanakan adalah Perseroan Terbatas &#13;
2&#13;
. Sumber air Pabrik Pupuk ZA ini berasal dari Sungai Musi, Kota&#13;
Palembang, Provinsi Sumatera Selatan dan untuk memenuhi kebutuhan listrik&#13;
Pabrik Pupuk ZA sebesar 797,852 kW, maka diperoleh dari Generator Diesel.&#13;
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut :&#13;
1. Fixed Capital Investment &#13;
ix&#13;
ABSTRACT&#13;
This preliminary of za fertilizer design with neturalization process using&#13;
ammonia, sulfuric acid and air as raw materials with capacity of production is&#13;
140.000 ton/year with workdays 330 days per year. Form of this company is&#13;
Limited Liability Company &#13;
ix&#13;
2&#13;
. Water resources of&#13;
this plant obatained from Musi River in Palembang City and for electricity supply&#13;
obtained from Diesel Generator with total power 797,852 kW.&#13;
From economic analysis was obtained:&#13;
1. Fixed Capital Investment</note>
 <subject authority="">
  <topic>FERTILIZERS - CHEMICAL ENGINEERING</topic>
 </subject>
 <classification>668.62&#13;
</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>33472</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2017-08-10 16:15:12</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2020-03-11 09:00:53</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>