PRARANCANGAN PABRIK KALSIUM SULFAT DIHIDRAT (GIPSUM) DARI BATUAN FOSFAT DAN ASAM SULFAT MENGGUNAKAN WET PROCESS KAPASITAS 200.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK KALSIUM SULFAT DIHIDRAT (GIPSUM) DARI BATUAN FOSFAT DAN ASAM SULFAT MENGGUNAKAN WET PROCESS KAPASITAS 200.000 TON/TAHUN


Pengarang

RAISHA AZZAHRA - Personal Name;

Dosen Pembimbing

M. Faisal - 197309061998021001 - Dosen Pembimbing I
Muhammad Zaki - 196503071992031003 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

2204103010077

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : .,

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

ABSTRAK

Prarancangan pabrik Kalsium Sulfat Dihidrat (Gipsum) ini menggunakan batuan fosfat dan asam fosfat sebagai bahan baku. Kapasitas produksi pabrik Kalsium Sulfat Dihidrat ini adalah 200.000 ton/tahun dengan hari kerja 330 hari/tahun. Perseroan Terbatas (PT) adalah bentuk perusahaan yang direncanakan dengan menggunakan struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 188 orang. Lokasi pabrik direncanakan didirikan di Kecamatan Manyar Kabupaten Gresik, Provinsi Jawa Timur dengan luas tanah sebesar 26.730 m2. Kebutuhan air untuk pabrik ini sebesar 272.636,17 kg/jam yang diperoleh dari Sungai Bengawan Solo. Sumber listrik diperoleh dari generator dengan sumber daya 2.229,6625 kW
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
Fixed Capital Investment = Rp333.774.263.472,56
Working Capital Investment = Rp 83.443.565.868
Total Capital Investment = Rp 417.217.829.340
Total Biaya Produksi = Rp1.380.053.346.897
Hasil Penjualan = Rp 1.812.929.875.78
Laba bersih = Rp 303.013.570.218,8
Pay Out Time (POT) = 3 tahun 5 bulan
Internal Rate Of Return (IRR) =25,93%
Break-even Point (BEP) = 43,76%

ABSTRACT The preliminary design of the Calcium Sulfate Dihydrate (Gypsum) plant uses phosphate rock and phosphoric acid as raw materials. The production capacity of the Calcium Sulfate Dihydrate plant is 200,000 tons/year with 330 working days/year. A Limited Liability Company (PT) is a company form planned using a line and staff structure. The workforce needed to run this company is 188 people. The factory is planned to be located in Manyar District, Gresik Regency, East Java Province with a land area of 26,730 m2. The air requirement for this plant is 272,636.17 kg/hour which is obtained from the Bengawan Solo River. The electricity source is a generator with a power output of 2,229.6625 kW. The results of the economic analysis are as follows: Fixed Capital Investment = IDR 333.774.263.472 Working Capital Investment = IDR 83.443.565.868 Total Capital Investment = IDR 417.217.829.340 Total Production Costs = IDR 1.380.053.346.897 Sales Revenue = IDR 1.812.929.875.78 Net Profit = IDR 303.013.570.218 Payout Time (POT) = 3 year and 5 months Internal Rate of Return (IRR) = 25,93% Break-even Point (BEP) = 43,76%