Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PENILAIAN TINGKAT KEMATANGAN MANAJEMEN WAKTU PADA PERUSAHAAN KONSTRUKSI RNDI KOTA BANDA ACEH
Pengarang
JIHAN FARIDA - Personal Name;
Dosen Pembimbing
Nomor Pokok Mahasiswa
2204101010130
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S1) / PDDIKTI : 22201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Sipil., 2026
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Penelitian ini bertujuan untuk menilai tingkat kematangan manajemen waktu pada perusahaan konstruksi berkualifikasi menengah di Kota Banda Aceh serta mengetahui perbandingan tingkat kematangan antarperusahaan. Penelitian ini menggunakan model PM Solutions Project Maturity Management Model (PMS-PMMM). Metode yang digunakan adalah metode kuantitatif dengan pengumpulan data melalui kuesioner kepada 7 responden dari 7 perusahaan konstruksi. Data dianalisis menggunakan analisis deskriptif dengan menghitung nilai rata-rata (mean) pada setiap proses manajemen waktu, kemudian diinterpretasikan untuk menentukan tingkat kematangan. Hasil penelitian menunjukkan bahwa tingkat kematangan manajemen waktu pada perusahaan konstruksi berkualifikasi menengah di Kota Banda Aceh secara umum berada pada Standardized (Level 3). Proses dengan tingkat kematangan tertinggi adalah Perencanaan Jadwal, sedangkan proses dengan tingkat kematangan terendah adalah Pengendalian Jadwal. Hasil ini menunjukkan bahwa perusahaan konstruksi yang diteliti telah memiliki penerapan manajemen waktu yang cukup baik, terutama pada tahap perencanaan, namun masih memerlukan peningkatan pada aspek pengendalian, pengembangan, dan evaluasi jadwal proyek. Dengan demikian, dapat disimpulkan bahwa sistem manajemen waktu pada perusahaan konstruksi berkualifikasi menengah di Kota Banda Aceh telah diterapkan pada tingkat yang cukup baik, tetapi belum berkembang secara merata pada seluruh proses manajemen waktu.
This study aims to assess the level of time management maturity in medium-qualified construction companies in Banda Aceh registered and to determine the comparison of maturity levels among companies. This study uses PM Solution Project Management Maturity Model (PMS-PMMM). The research method applied is a quantitative method by collecting data through questionnaires from 7 respondents representing 7 construction companies. The data were analyzed using descriptive analysis by calculating the mean value of each time management process, which was then interpreted to determine the maturity level. The results show that the overall level of time management maturity in medium-qualified construction companies in Banda Aceh is at Standardized (Level 3). The process with the highest maturity level is Schedule Planning, while the process with the lowest maturity level is Schedule Control. These findings indicate that the construction companies studied have implemented time management fairly well, particularly in the planning stage, but still require improvement in schedule control, schedule development, and project schedule evaluation. Thus, it can be concluded that the time management system in medium-qualified construction companies in Banda Aceh has been implemented at a fairly good level, but has not yet developed evenly across all time management processes.
PENILAIAN TINGKAT KEMATANGAN MANAJEMEN BIAYA PADA PERUSAHAAN KONSTRUKSI DI KOTA BANDA ACEH (SARAH SYAKIRAH, 2026)
KAJIAN BIAYA MUTU PADA PENERAPAN
SISTEM MANAJEMEN MUTU IS0-9000 TERHADAP PROYEK KONSTRUKSI GEDUNG DI BANDA ACEH (Siti Rahmah, 2013)
IDENTIFIKASI PENERAPAN MANAJEMEN PROYEK KONSTRUKSI SEBAGAI FAKTOR DAYA SAING KONTRAKTOR DI KOTA BANDA ACEH (Tri Rachma Sari, 2018)
KAJIAN KINERJA MANAJEMEN PROYEK KONSTRUKSI GEDUNG DAN RUMAH DI KOTA BANDA ACEH (ANDIEQA BILLYSYAH, 2014)
PENGARUH RESPON PERUSAHAAN DALAM INVESTASI TEKNOLOGI INFORMASI TERHADAP KINERJA PERUSAHAAN: KEMATANGAN TEKNOLOGI INFORMASI DAN UKURAN PERUSAHAAN SEBAGAI VARIABEL ANTESEDEN (STUDI EMPIRIS PADA PERBANKAN DAN PERUSAHAAN ASURANSI DI KOTA BANDA ACEH) (M Arief Hidayat, 2024)