LAPORAN KERJA PRAKTEK
SETTING THERMAL OVERLOAD MOTOR LV (LOW VOLTAGE) AIRSLIDE FAN FINISH MILL DI PT. SOLUSI BANGUN ANDALAS
Pengarang
Nyak Firmanda - Personal Name;
Dosen Pembimbing
Mahdi Syukri - 196812101998021001 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
2304005010001
Fakultas & Prodi
Fakultas Teknik / Teknik Listrik (D3) / PDDIKTI : 20403
Subject
Kata Kunci
Penerbit
Banda Aceh : DIII-Teknik Listrik., 2026
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Motor Low Voltage (LV) pada sistem AirSlide Fan di area Finish Mill berperan
penting dalam proses transportasi material Semen secara pneumatik. Keandalan
motor sangat dipengaruhi oleh sistem proteksi, khususnya Thermal Overload Relay
(TOR) yang berfungsi melindungi motor dari arus beban lebih (Overcurrent) dan
kenaikan temperatur berlebih.
Penelitian ini bertujuan untuk menganalisis kesesuaian setting Thermal Overload
terhadap arus nominal motor AirSlide Fan di area Finish Mill PT. Solusi Bangun
Andalas. Metode yang digunakan meliputi pengambilan data Nameplate Motor,
pengukuran arus beban aktual menggunakan Clamp meter, serta evaluasi setting
overload berdasarkan standar 1.05-1,15 kali arus nominal.
The Low Voltage (LV) motor in the AirSlide Fan system in the Finish Mill area plays a critical role in the pneumatic cement material transportation process. Motor reliability is greatly influenced by the protection system, particularly the Thermal Overload Relay (TOR), which protects the motor from overcurrent and excessive temperature rise. This study aims to analyze the suitability of the Thermal Overload setting to the nominal current of the AirSlide Fan motor in the Finish Mill area of PT. Solusi Bangun Andalas. The methods used include collecting motor nameplate data, measuring the actual load current using a clamp meter, and evaluating the overload setting based on the standard 1.05-1.15 times the nominal current.
KOMPARASI PENGGUNAAN MV CAPASITOR TERHADAP KUALITAS FAKTOR DAYA PADA MOTOR CEMENT MILL DI PT. SOLUSI BANGUN ANDALAS (, 2026)
ANALISIS PERHITUNGAN MEAN TIME BETWEEN FAILURE (MTBF) DAN MEAN TIME TO REPAIR (MTTR) PADA CEMENT MILL-PT SOLUSI BANGUN ANDALAS (Regina Angela, 2026)
PENERAPAN PENGHITUNGAN PAJAK PERTAMBAHAN NILAI (PPN) PADA PT. SOLUSI BANGUN ANDALAS (Alfizar Maulana, 2020)
STUDI PEMANFAATAN PANAS BUANG MENJADI ENERGI LISTRIK MENGGUNAKAN TEKNOLOGI WASTE HEAT RECOVERY POWER GENERATION (WHRPG) PADA INDUSTRI SEMEN (RIVALDI, 2019)
MEKANISME PENETAPAN DAN PENYETORAN PAJAK MINERAL BUKAN LOGAM DAN BATUAN ATAS LIMESTONE DAN SILTSTONE PADA PT SOLUSI BANGUN ANDALAS (Maulidya Savitri, 2020)