<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="1708971">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>NUR AINI</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik Kimia</publisher>
   <dateIssued>2026</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code"></languageTerm>
  <languageTerm type="text"></languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik Bahan bakar ini menggunakan plastik sebagai bahan&#13;
baku. Kapasitas produksi pabrik Bahan bakar ini adalah 25.000 ton/tahun dengan&#13;
hari kerja yaitu 330 hari/tahun, Bentuk perusahaan yang direncanakan adalah&#13;
Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf.&#13;
Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 150 orang.&#13;
Pabrik Bahan bakar ini direncakan berlokasi di Kawasan Industri Ladong,&#13;
Kabupaten Aceh besar, Provinsi Aceh dengan luas tanah 20.000 m. Sumber air&#13;
pabrik bahan bakar berasal dari Sungai Krueng Raya, Provinsi Aceh dan untuk&#13;
memenuhi kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan&#13;
generator dengan daya 27.010,64 kW&#13;
Hasil analisa ekonomi yang diperoleh sebagai berikut:` &#13;
1. Fixed Capital Investment (FCI)                 : Rp 174.282.284.069 &#13;
2. Working Capital Investment (WCI)           : Rp 43.570.571.017&#13;
3. Total Capital Investment (TCI)                  : Rp 217.852.855.086&#13;
4. Total Production Cost (TPC)                     : Rp 188.297.060.736&#13;
5. Sales Revenue                                &#13;
   : Rp 300.843.205.630 &#13;
6. Laba Bersih                                                : Rp 112.546.144.894&#13;
7. Pay Out Time (POT)                                  : 4 Tahun&#13;
8. Break Event Point (BEP)                           : 34,71%&#13;
9. Internal Rate of Return (IRR)                    : 28,96%&#13;
</note>
 <note type="statement of responsibility"></note>
 <classification>0</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>1708971</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2026-01-20 14:40:17</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2026-01-20 16:19:24</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>