PRARANCANGAN PABRIK BAHAN BAKAR MINYAK DARI PLASTIK BEKAS DENGAN KAPASITAS BAHAN BAKU 25.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK BAHAN BAKAR MINYAK DARI PLASTIK BEKAS DENGAN KAPASITAS BAHAN BAKU 25.000 TON/TAHUN


Pengarang

Annisa Farahiyah - Personal Name;

Dosen Pembimbing

Mukramah - 199206102020011101 - Dosen Pembimbing I
Yunardi - 196009151988101001 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

2104103010006

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik., 2026

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik Bahan bakar ini menggunakan plastik sebagai bahan baku. Kapasitas produksi pabrik Bahan bakar ini adalah 25.000 ton/tahun dengan hari kerja yaitu 330 hari/tahun, Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 150 orang. Pabrik Bahan bakar ini direncakan berlokasi di Kawasan Industri Ladong, Kabupaten Aceh besar, Provinsi Aceh dengan luas tanah 20.000 m. Sumber air pabrik bahan bakar berasal dari Sungai Krueng Raya, Provinsi Aceh dan untuk memenuhi kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya 27.010,64 kW
Hasil analisa ekonomi yang diperoleh sebagai berikut:`
1. Fixed Capital Investment (FCI) : Rp 174.282.284.069
2. Working Capital Investment (WCI) : Rp 43.570.571.017
3. Total Capital Investment (TCI) : Rp 217.852.855.086
4. Total Production Cost (TPC) : Rp 188.297.060.736
5. Hasil Penjualan : Rp 300.843.205.630
6. Laba Bersih : Rp 112.546.144.894
7. Pay Out Time (POT) : 4 Tahun
8. Break Event Point (BEP) : 34,71%
9. Internal Rate of Return (IRR) : 28,96%

This preliminary design of a fuel production plant utilizes plastic waste as the raw material. The plant has a production capacity of 25,000 tons per year with 330 operating days annually. The proposed business entity is a Limited Liability Company (PT) with a line-and-staff organizational structure. The plant requires a total workforce of 150 employees. The facility is planned to be located in Ladong Industrial Area, Aceh Besar District, Aceh Province, covering a land area of 20,000 m². The water supply for the plant will be sourced from the Krueng Raya River, Aceh Province, while electricity demand will be supplied by the State Electricity Company (PLN) and a generator with a capacity of 27,010.64 kW. The results of economic analysis are below: 1. Fixed Capital Investment (FCI) : Rp 174.282.284.069 2. Working Capital Investment (WCI) : Rp 43.570.571.017 3. Total Capital Investment (TCI) : Rp 217.852.855.086 4. Total Production Cost (TPC) : Rp 188.297.060.736 5. Sales Revenue : Rp 300.843.205.630 6. Net Profit : Rp 112.546.144.894 7. Pay Out Time (POT) : 4 years 8. Break Even Point (BEP) : 34,71% 9. Internal Rate of Return (IRR) : 28,96%