<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="1705953">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Cut Keumala Firna</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2025</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRAK	&#13;
&#13;
	Prarancangan pabrik susu bubuk rendah laktosa ini menggunakan bahan baku susu sapi segar. Susu sapi segar diperoleh dari daerah Malang, Jawa Timur. Kapasitas produksi pabrik ini adalah 25.000 Ton/Tahun dengan hari kerja 330 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 127 orang. Lokasi pabrik direncanakan didirikan di daerah Malang, Jawa Timur dengan luas tanah 15.000 m2. Sumber air pabrik ini berasal dari Sungai Brantas, Jawa Timur dengan total kebutuhan air sebesar 34.176,70 kg/jam, serta untuk memenuhi kebutuhan listrik sebesar 5,9 MW diperoleh dari generator diesel. &#13;
&#13;
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut : &#13;
1. Fixed Capital Investment	=	Rp. 421.549.757.573&#13;
2. Working Capital Investment	=	Rp. 105.387.439.393&#13;
3. Total Capital Investment	=	Rp. 526.937.196.966&#13;
4. Total Production Cost	=	Rp. 4.355.908.266.832&#13;
5. Revenue	=	Rp. 10.857.767.996.336&#13;
6. Laba Bersih	=	Rp. 130.416.956.249&#13;
7.	Pay Out Time (POT)		   =     5,2 tahun&#13;
8.	Break Event Point (BEP)	   =     43%&#13;
9.	Internal Rate of Return (IRR)	   =     17,41%.&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>MILK - PROCESSING</topic>
 </subject>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>1705953</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2025-10-30 13:59:26</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2025-10-30 15:31:19</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>