PRARANCANGAN PABRIK HIDROGEN MELALUI PROSES GASIFIKASI BATUBARA DENGAN KAPASITAS 30.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK HIDROGEN MELALUI PROSES GASIFIKASI BATUBARA DENGAN KAPASITAS 30.000 TON/TAHUN


Pengarang

Herianda - Personal Name;

Dosen Pembimbing

Fauzi - 197008111998031003 - Dosen Pembimbing I
Abubakar - 196108071990021001 - Dosen Pembimbing II
Aula Chairunnisak - 199103312020122006 - Penguji
Cut Meurah Rosnelly - 196801091994032003 - Penguji



Nomor Pokok Mahasiswa

2104103010075

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Subject
-
Kata Kunci
-
Penerbit

Banda Aceh : Fakultas Teknik., 2025

Bahasa

No Classification

-

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Prarancangan pabrik hidrogen ini direncanakan memanfaatkan batubara
sebagai bahan baku melalui proses gasifikasi untuk menghasilkan hidrogen dengan
kapasitas produksi sebesar 30.000 ton per tahun. Pabrik akan berlokasi di Sangatta,
Kalimantan Timur, yang dipilih karena kedekatannya dengan sumber batubara dari
PT Kaltim Prima Coal (PT KPC), sehingga menjamin ketersediaan bahan baku dan
efisiensi transportasi. Operasi pabrik dirancang berlangsung selama 330 hari kerja
per tahun dengan sistem kerja 24 jam per hari. Bentuk perusahaan yang
direncanakan adalah Perseroan Terbatas (PT) dengan struktur organisasi garis dan
staf, serta memerlukan sekitar 133 tenaga kerja untuk mendukung kegiatan
operasional. Berdasarkan hasil analisis ekonomi, proyek ini dinilai layak untuk
direalisasikan dan berpotensi memberikan nilai tambah terhadap pemanfaatan
sumber daya batubara lokal. Hasil analisa ekonomi yang diperoleh adalah sebagai
berikut:
1. Fixed Capital Investment (FCI)
2. Working Capital Investment (WCI)
3. Total Capital Investment (TCI)
4. Total Production Cost (TPC)
5. Revenue
6. Laba Bersih
7. Pay Out Time (POT)
8. Break Event Point (BEP)
9. Internal Rate of Return (IRR)
= Rp 2.507.565.401.131
= Rp 626.891.350.283
= Rp 3.134.456.751.414
= Rp 2.600.543.706.482
= Rp 4.420.622.628.446
= Rp 1.365.059.191.472
= 4,27 Tahun
= 22,10%
= 25%
Berdasarkan studi kelayakan teknis dan ekonomis di atas, maka dapat
disimpulkan bahwa prarancangan pabrik Hidrogen ini layak untuk dilanjutkan ke
tahap konstruksi.

The preliminary design of this hydrogen plant is planned to utilize coal as the raw material through a gasification process to produce hydrogen with a production capacity of 30,000 tons per year. The plant will be located in Sangatta, East Kalimantan, which was selected due to its proximity to the coal supply source from PT Kaltim Prima Coal (PT KPC), ensuring raw material availability and transportation efficiency. The plant is designed to operate for 330 working days per year on a continuous 24-hour basis. The proposed business entity is a Limited Liability Company (PT) with a line and staff organizational structure, requiring approximately 133 employees to support plant operations. Based on the economic analysis, the project is considered feasible to be realized and is expected to add value to the utilization of local coal resources. The results of the economic analysis are as follows: 1. Fixed Capital Investment (FCI) 2. Working Capital Investment (WCI) 3. Total Capital Investment (TCI) 4. Total Production Cost (TPC) 5. Revenue 6. Net Profit 7. Pay Out Time (POT) 8. Break Event Point (BEP) 9. Internal Rate of Return (IRR) = Rp 2.507.565.401.131 = Rp 626.891.350.283 = Rp 3.134.456.751.414 = Rp 2.600.543.706.482 = Rp 4.420.622.628.446 = Rp 1.365.059.191.472 = 4,27 years = 22,10% = 25% Based on the results of the technical and economic feasibility study, it can be concluded that the preliminary design of this hydrogen plant is feasible to proceed to the construction stage.