Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
ANALISIS KOMPARATIF EFISIENSI BIAYA DAN KELAYAKAN RNEKONOMI ANTARA SISTEM KONVENSIONAL DAN BUKIT ASAM RNMINE DISPATCH OPTIMATIONS SYSTEM PADA STUDI KASUS: RNPIT 3 TIMUR BANKO TENGAH PT BUKIT ASAM TBK
Pengarang
MUHAMMAD HANIN RIZFI - Personal Name;
Dosen Pembimbing
Febi Mutia - 198702042019032011 - Dosen Pembimbing I
Zati Hulwani - 199503032024062002 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
2104108010051
Fakultas & Prodi
Fakultas Teknik / Teknik Pertambangan (S1) / PDDIKTI : 31201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2025
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Pertambangan batubara merupakan sektor strategis dalam mendukung
pertumbuhan ekonomi nasional, di mana efisiensi operasional, khususnya dalam
proses pemuatan dan pengangkutan (hauling), menjadi faktor kunci keberhasilan
produksi. PT Bukit Asam Tbk, sebagai salah satu perusahaan tambang batubara
terbesar di Indonesia, telah mengimplementasikan Bukit Asam Mine Dispatch
Optimations System sebagai sistem berbasis teknologi untuk mengatasi inefisiensi
sistem konvensional. Penelitian ini bertujuan untuk membandingkan efisiensi biaya
dan kelayakan ekonomi antara sistem pengangkutan konvensional dan Bukit Asam
Mine Dispatch Optimations System di area PIT 3 Timur Banko Tengah. Penelitian
dilakukan dengan pendekatan kuantitatif melalui kombinasi data primer dan
sekunder. Data primer berupa cycle time, sedangkan data sekunder diperoleh dari
laporan Bukit Asam Mine Dispatch Optimations System, informasi biaya, serta
dokumen historis perusahaan. Analisis efisiensi dilakukan dengan tiga skenario
yaitu sistem konvensional (0%), non-optimal dan aktual Bukit Asam Mine Dispatch
Optimations System (5–15%), serta continuous improvement (20–25%). Hasil
analisis menunjukkan bahwa sistem Bukit Asam Mine Dispatch Optimations System
dengan efisiensi 15% mampu meningkatkan produktivitas hingga 17,65% dan
produksi sebesar 35,29%, dengan potensi pencapaian lebih tinggi melalui
peningkatan berkelanjutan. Dari sisi biaya, implementasi sistem ini menghasilkan
penghematan sebesar 15,48% hingga 24,18%, bahkan dapat mencapai 35% dalam
skenario continuous improvement. Secara ekonomi, sistem ini dinilai sangat layak
diterapkan, ditunjukkan oleh nilai NPV sebesar Rp265,87 miliar, IRR sebesar
106%, dan Payback Period dalam waktu ± 6 bulan. Penelitian ini menyimpulkan
bahwa Bukit Asam Mine Dispatch Optimations System tidak hanya unggul secara
teknis, tetapi juga efisien secara biaya dan layak sebagai investasi jangka panjang
dalam operasional pertambangan.
Coal mining is a strategic sector in supporting national economic growth, where operational efficiency particularly in the hauling process plays a crucial role in production success. PT Bukit Asam Tbk, as one of the largest coal mining companies in Indonesia, has implemented the Bukit Asam Mine Dispatch Optimations System, a technology-based system designed to address inefficiencies in conventional operations. This study aims to compare cost efficiency and economic feasibility between the conventional hauling system and the Bukit Asam Mine Dispatch Optimations System in the PIT 3 East Banko Tengah area. The research uses a quantitative approach, combining both primary and secondary data. Primary data includes cycle time, while secondary data is obtained from Bukit Asam Mine Dispatch Optimations System reports, cost information, and historical company documents. The efficiency analysis was conducted using three scenarios, which are the conventional system (0%), the non-optimal and actual performance of the Bukit Asam Mine Dispatch Optimization System (5–15%), and the continuous improvement scenario (20–25%). The analysis results indicate that the Bukit Asam Mine Dispatch Optimations System, with 15% efficiency, can improve productivity by up to 17.65% and increase production by 35.29%, with even greater potential through continuous improvement. From a cost perspective, the implementation of this system results in savings ranging from 15.48% to 24.18%, and potentially up to 35% under Continuous Improvement scenarios. Economically, the system is considered highly feasible, as reflected by an NPV of IDR 265.87 billion, an IRR of 106%, and a Payback Period of approximately six months. This study concludes that the Bukit Asam Mine Dispatch Optimations System not only excels in technical performance but is also cost-efficient and viable as a long-term investment in mining operations.
PERBANDINGAN PENGGUNAAN METODE BOTTOM AIR DECK TERHADAP FRAGMENTASI HASIL PELEDAKAN, POWDER FACTOR DAN GROUND VIBRATION DI PIT 2 BANKO BARAT PT. BUKIT ASAM, TBK (Syafdarul Achyar, 2019)
ANALISIS OPTIMASI OWNING OPERATING COST (OOC) ALAT ANGKUT DUMPTRUCK VOLVO FMX 440 DALAM KEGIATAN COAL HAULING DI PIT 2 BANKO BARAT PT BUKIT ASAM, TANJUNG ENIM, SUMATERA SELATAN (FARHAN SURYA WARDHANA, 2026)
ANALISIS ECONOMIC DISPATCH MENGGUNAKAN SOFTWARE OPEN SOURCE SCILAB GUI (Andri Sanova, 2024)
OPTIMALISASI LERENG GALIAN BANKO BARAT PIT 2 TAHUN 2016 DI PT. BUKIT ASAM (PERSERO), TBK. UNIT PERTAMBANGAN TANJUNG ENIM, PROVINSI SUMATERA SELATAN (Zati Hulwani, 2016)
PERBANDINGAN PRESTASI BELAJAR MATA PELAJARAN SEJARAH SISWA KELAS XI SMA NEGERI 1 BUKIT DAN SMA NEGERI 2 BUKIT BENER MERIAH (supianiko, 2015)