<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="164251">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Nabila Fardina Idrus</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2025</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan Pabrik Natrium Nitrat menggunakan bahan baku berupa Asam Nitrat dan dan Natrium Hidroksida. Proses produksi secara keseluruhan menggunakan proses netralisasi, pemekatan menggunakan multiple effect evaporator dan cooling crystallization. Kapasitas produksi sebesar 55.000 ton/tahun dengan waktu operasi 330 hari/tahun dan waktu 24 jam/hari. Pabrik ini direncanakan dibangun di Kepuh, Kecamatan Ciwandan, Kota Cilegon, Banten, Indonesia. dengan luas area pabrik 10.000 m2. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf dan tenaga kerja sebanyak 149 orang. Kebutuhan air untuk pabrik berasal dari Sungai Cidanau dengan laju alir 72.426,558 kg/jam, dan untuk kebutuhan listrik diperoleh dari generator dengan daya 1.759,574 kW. Hasil analisis ekonomi diperoleh sebagai berikut:&#13;
1.	Fixed Capital Investment (FCI)		=  Rp 1.287.041.007.123,15&#13;
2.	Working Capital Investment (WCI)	=  Rp 280.508.937.449,92    &#13;
3.	Total Capital Investment (TCI)		=  Rp 2.805.089.374.499,17&#13;
4.	Total Production Cost (TPC)		=  Rp 6.433.722.821.246,65&#13;
5.	Sales Cost (SC)		=  Rp 8.150.490.785.172,15&#13;
6.	Laba Bersih		=  Rp 1.287.575.972.944,13&#13;
7.	Pay Out Time (POT)		= 3,41 tahun&#13;
8.	Break Event Point (BEP)		= 38,48 %&#13;
9.	Internal Rate of Return (IRR)		= 15,59 %&#13;
10.	Rate of Return (ROR)		= 45,90 %&#13;
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat disimpulkan bahwa Prarancangan Pabrik Natrium Nitrat ini layak untuk dilanjutkan ke tahap rancangan.&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>SODIUM HYDROXIDE - CHEMICAL ENGINEERING</topic>
 </subject>
 <subject authority="">
  <topic>NITRIC ACID - CHEMICAL ENGINEERING</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>SODIUM NITRATE</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>164251</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2025-07-21 15:03:53</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2025-07-23 16:12:35</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>