ANALISIS KETERLAMBATAN PROYEK KONSTRUKSI JALAN MENGGUNAKAN METODE FAULT TREE ANALYSIS (FTA)
Pengarang
Iqbal Ramadhan - Personal Name;
Dosen Pembimbing
Fachrurrazi - 197005062000121001 - Dosen Pembimbing I
Mubarak - 197505062000121001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
2104201010034
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (S2) / PDDIKTI : 22101
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik S2., 2025
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Dalam sebuah proyek, ketepatan waktu dalam mengerjakan suatu pekerjaan haruslah ditekankan di samping mutu pengerjaannya mengikuti standar atau ketentuan yang berlaku. Namun tidak dapat dipungkiri bahwa terdapat faktor yang bisa menghambat proyek tidak terlaksana sesuai dengan waktu yang telah direncanakan. Keterlambatan proyek tersebut utamanya disebabkan oleh terlambatnya pembebasan lahan, desain yang sering berubah, target pekerjaan tidak sesuai dengan rencana, terbatasnya ketersediaan material, kurangnnya pengawasan kedatangan material, dll. Penelitian ini bertujuan untuk menganalisis keterlambatan menggunakan metode Fault Tree Analysis (FTA) untuk mengidentifikasi hubungan kausal dan probabilitas pada setiap faktor penyebab serta menganalisis perbandingan hasil yang diperoleh dari data primer dan data sukunder terkait keterlambatan proyek pembangunan jalan. Faktor penelitian meliputi tiga kategori utama yaitu faktor owner, faktor kontraktor dan faktor eksternal. Data primer diperoleh melalui penyebaran kuesioner kepada 11 responden yang dipilih secara purposive, sementara data sekunder didasarkan pada catatan keterlambatan proyek. Hasil analisis menunjukkan probabilitas dengan kontribusi terbesar berasal dari faktor kontraktor (55,22%), diikuti oleh faktor owner (29,45%) dan faktor eksternal (14,93%). Hasil analisis yang diperoleh dari data sekunder menunjukkan faktor pelaksanaan (54,00%), diikuti oleh faktor owner (30,00%) dan faktor eksternal (16,00%). Hasil penelitian ini menunjukkan pentingnya mengantisipasi keterlambatan melalui peningkatan koordinasi dalam pelaksaan, serta pengawasan ketat pada saat perencaan dan pelaksanaan.
Kata Kunci: Keterlambatan proyek, Fault Tree Analysis, Probabilitas
In a project, the timeliness of doing a job must be emphasized in addition to the quality of workmanship must be in accordance with applicable standards or regulations. However, it cannot be denied that many things can cause this project not to be in accordance with the predetermined schedule. The project delays are mainly caused by late land acquisition, designs that often change, work targets are not in accordance with the plan, limited availability of materials, lack of supervision of material arrival, etc. This research aims to analyze the causes of delays using the Fault Tree Analysis (FTA) method to identify causal relationships and probabilities in each causal factor and analyze the comparison of results obtained from primary data and secondary data related to delays in road construction projects. The research factors include three main categories, namely owner factors, contractor factors and external factors. Primary data was obtained through questionnaires to 11 purposively selected respondents, while secondary data was based on project delay records. The results of the analysis showed that the probability with the largest contribution came from contractor factors (55.22%), followed by owner factors (29.45%) and external factors (14.93%). The analysis results obtained from secondary data show the implementation factor (54.00%), followed by the owner factor (30.00%) and external factors (16.00%). The results of this study indicate the importance of anticipating delays through increased coordination in implementation, as well as close supervision during planning and implementation. Keywords: Project delay, Fault Tree Analysis, Probability.
ANALISIS KETERLAMBATAN PELAKSANAAN PROYEK GEDUNG MENGGUNAKAN METODE FAULT TREE ANALYSIS (FTA) (Nitasya Dwimaulidina, 2025)
STUDI FAKTOR TENAGA KERJA, MATERIAL DAN PERALATAN SEBAGAI PENYEBAB KETERLAMBATAN PEKERJAAN PROYEK KONSTRUKSI JALAN DAN JEMBATAN DI KOTA SUBULUSSALAM (Syahru Ramadhan, 2015)
STUDI KETERLAMBATAN PENYELESAIAN PROYEK PRASARANA JALAN KABUPATEN DI ACEH BARAT (Asrizal, 2024)
IDENTIFIKASI RISIKO PENYEBAB KETERLAMBATAN PADA PROYEK JALAN TOL SIGLI-BANDA ACEH (DARA MUTHMAINNAH RIZQINA, 2025)
FAKTOR KETERLAMBATAN PELAKSANAAN PROYEK DITINJAU DARI WAKTU PELAKSANAAN DI PROVINSI ACEH (MUHAMMAD SULAIMAN, 2017)