PERHITUNGAN KAPASITAS ALAT GALI-MUAT DAN ALAT ANGKUT DALAM MEMENUHI TARGET PRODUKSI PT BARA ENERGI LESTARI TAHUN 2025, KABUPATEN NAGAN RAYA, ACEH
Pengarang
Fadiya Aqila Anhar - Personal Name;
Dosen Pembimbing
Haqul Baramsyah - 198411282015041002 - Dosen Pembimbing I
Febi Mutia - 198702042019032011 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
2104108010022
Fakultas & Prodi
Fakultas Teknik / Teknik Pertambangan (S1) / PDDIKTI : 31201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik., 2025
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Indonesia sangat bergantung pada batubara sebagai sumber energi utama. Efisiensi produksi perlu ditingkatkan oleh industri pertambangan guna menjamin pasokan energi yang berkelanjutan. PT Bara Energi Lestari telah menetapkan target produksi tahun 2025 dengan overburden sebesar 15.000.371 BCM, batubara sebesar 3.045.363 ton, dan stripping ratio berdasarkan life of mine (LOM) sebesar 5,8. Target yang telah ditetapkan dapat tidak tercapai akibat berbagai kendala seperti faktor teknis dan faktor operasional. Berdasarkan hasil evaluasi pada alat mekanis exisiting, produksi aktual overburden adalah sebesar 11.496.872,6 BCM dengan ketercapaian produksi sebesar 77%, sedangkan produksi aktual batubara sebesar 2.468.187,9 ton dengan ketercapaian produksi sebesar 81%. Ketidaktercapaian produksi tersebut akibat rendahnya produktivitas akibat tingginya angka cycle time dan rendahnya waktu kerja efektif sehingga menurunkan tingkat efisiensi kerja. Maka dari itu, penelitian ini bertujuan untuk memberikan upaya optimalisasi guna meningkatkan capaian produksi unit melalui simulasi dengan dua skenario, dimana skenario 1 berfokus pada optimalisasi kebutuhan unit, sedangkan skenario 2 menggunakan kombinasi antara penyesuaian waktu kerja dan optimalisasi kebutuhan unit. Kedua skenario berhasil meningkatkan angka capaian produksi dengan ketercapaian produksi overburden dan batubara pada skenario 1 sebesar 103% dan 102%, sedangkan pada skenario 2 ketercapaian produksi overburden dan batubara sebesar 101% dan 103%. Berdasarkan analisis perbandingan, skenario 2 direkomendasikan sebagai strategi utama karena lebih efisien dalam pemanfaatan waktu kerja dan sumber daya.
Indonesia relies heavily on coal as its main source of energy. Production efficiency needs to be improved by the mining industry to ensure sustainable energy supply. PT Bara Energi Lestari has set a 2025 production target with overburden of 15,000,371 BCM, coal of 3,045,363 tons, and stripping ratio based on life of mine (LOM) of 5.8. The targets set may not be achieved due to various constraints such as technical and operational factors. Based on the evaluation results of the existing mechanical equipment, the actual overburden production was 11,496,872.6 BCM with a production achievement of 77%, while the actual coal production was 2,468,187.9 tons with a production achievement of 81%. The non-achievement of production is due to low productivity due to high cycle time and low effective working time, thus reducing the level of work efficiency. Therefore, this research aims to provide optimization efforts to increase unit production achievement through simulations with two scenarios, where scenario 1 focuses on optimizing unit requirements, while scenario 2 uses a combination of working time adjustment and optimization of unit requirements. Both scenarios succeeded in increasing the production achievement rate with overburden and coal production achievement in scenario 1 amounting to 103% and 102%, while in scenario 2 the overburden and coal production achievement was 101% and 103%. Based on the comparative analysis, scenario 2 is recommended as the main strategy because it is more efficient in utilizing working time and resources.
ANALISIS PRODUKTIVITAS ALAT GALI-MUAT DAN ALAT ANGKUT SERTA KECEPATAN ALAT ANGKUT PADA PENGUPASAN OVERBURDEN DI PT BARA ENERGI LESTARI BULAN DESEMBER 2024 (Silfia, 2026)
KAJIAN TEKNIS PRODUKSI ALAT GALI MUAT DAN ANGKUT PENAMBANGAN BATUBARA PT MIFA BERSAUDARA (T RYO ROSMANDA PARASAMIA, 2018)
PRODUKTIVITAS ALAT GALI MUAT HITACHI 470 LC DAN ALAT ANGKUT MERCEDES BENZ 4843 K DI JOBSITE SRIWIJAYA LINTAS RAYA PT MANGGALA USAHA MANUNGGAL (M FAUZUL IRHAM, 2019)
PENINGKATAN PRODUKTIVITAS PADA TAMBANG KUARI BATUGAMPING DENGAN MENGGUNAKAN TEORI ANTRIAN DI PT SINAR TAMBANG ARTHALESTARI, KECAMATAN AJIBARANG, KABUPATEN BANYUMAS, JAWA TENGAH (Muhammad Iqbal, 2017)
KAJIAN TEKNIS PENINGKATAN PRODUKTIVITAS EXCAVATOR CAT 340D2 PADA OVERBURDEN REMOVAL DI PIT IV PT. BARA ENERGI LESTARI, KABUPATEN NAGAN RAYA, ACEH (UTAMI TRIANI, 2018)