PRARANCANGAN PABRIK NATRIUM SILIKAT DARI NATRIUM HIDROKSIDA DAN PASIR SILIKA DENGAN PROSES HIDROTERMAL KAPASITAS PRODUKSI 48.000 TON/TAHUN
Pengarang
IRHAM MAULANA - Personal Name;
Dosen Pembimbing
Sri Mulyati - 197302272000122001 - Dosen Pembimbing I
Sofyana - 197106261998022001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
2104103010036
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Kimia., 2025
Bahasa
Indonesia
No Classification
660
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik natrium silikat bertujuan untuk untuk memenuhi kebutuhan natrium silikat di Indonesia dan juga meningkatkan pertumbuhan industri-industri baru yang menggunakan bahan baku natrium silikat. Proses produksi natrium yang digunakan adalah proses hidrotermal dengan mencapai 98% yang akan dijual seharga Rp 26.347.039/ton pada tahun 2030. Pabrik direncanakan beroperasi selama 330 hari per tahun secara kontinyu selama 24 jam per hari, dengan kapasitas produksi sebesar 48.000 ton/tahun dengan perhitungan neraca massa metode alur maju. Bentuk perusahaan yang direncanakan merupakan perseroan terbatas (PT) menggunakan struktur organisasi garis dan staff. Selain itu, kebutuhan tenaga kerja dalam menjalankan perusahaan adalah 140 orang. Lokasi pabrik direncanakan didirikan di Kecamatan Citangkil, Kota Cilegon, Provinsi Banten dengan luas tanah 9.120 m2. Sumber air yang digunakan berasal dari air Waduk Krenceng yang jaraknya 350 m dari lokasi pabrik dengan kebutuhan sebanyak 240.968,64 kg/hari. Adapun sumber listrik diperoleh dari PLTU Suralaya dengan daya sebesar 1.537,4 kW dan kebutuhan bahan bakar solar per bulan sebanyak 129.756 L/bulan.
Hasil analisis ekonomi yang diperoleh adalah sebagai berikut:
a. Fixed Capital Investment (FCI) = Rp 392.526.136.293
b. Working Capital Investment (WCI) = Rp 33.914.258.176
c. Total Capital Investment (TCI) = Rp 423.928.227.197
d. Total Production Cost (TPC) = Rp 1.053.119.553.361
e. Hasil Penjualan = Rp 1.264.657.888.826
f. Laba bersih = Rp 158.653.751.598
g. Pay Out Time (POT) = 3,82 tahun
h. Break Even Point (BEP) = 27,444%
i. Internal Rate of Return (IRR) = 33,17 %
Berdasarkan studi kelayakan teknis dan ekonomis yang telah dijelaskan di atas, dapat disimpulkan bahwa perancangan pabrik natrium silikat ini layak untuk dilanjutkan ke tahap kontruksi.
The preliminary design of a sodium silicate plant aims to meet the demand for sodium silicate in Indonesia and to foster the growth of new industries that use sodium silicate as a raw material. The sodium silicate production process used is the hydrothermal process, achieving a yield of 98%, with the product expected to be sold at Rp 26.347.039/ton in 2030. The plant is planned to operate for 330 days per year, continuously 24 hours a day, with a production capacity of 48.000 tons per year, based on forward flow mass balance calculations. The proposed business entity is a limited liability company (PT) with a line and staff organizational structure. The workforce required to run the company is 140 employees. The plant will be located in Citangkil District, Cilegon City, Banten Province, on a land area of 9.120 m2. The water source will be the Krenceng Reservoir, located 350 meters from the plant site, with a daily water requirement of 240.968,64 kg/day. The electricity will be supplied by the Suralaya Coal Power Plant with a power capacity of 1.537,4 kW, and the monthly diesel fuel requirement is 129.756 L/month. The results of the economic analysis are as follows: a. Fixed Capital Investment (FCI) = Rp 392.526.136.293 b. Working Capital Investment (WCI) = Rp 33.914.258.176 c. Total Capital Investment (TCI) = Rp 423.928.227.197 d. Total Production Cost (TPC) = Rp 1.053.119.553.361 e. Sales Cost = Rp 1.264.657.888.826 f. Net Profit = Rp 158.653.751.598 g. Pay Out Time (POT) = 3,82 years h. Break Even Point (BEP) = 27,444% i. Internal Rate of Return (IRR) = 33,17 % Based on the technical and economic feasibility studies described above, it can be concluded that the design of this sodium silicate plant is feasible to proceed to the construction stage.
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI NATRIUM HIDROKSIDA DAN PASIR SILIKA MENGGUNAKAN WET PROCESS DENGAN KAPASITAS PRODUKSI 35.000 TON/TAHUN (CUT NURUL ZAHRINA MARDIAN, 2022)
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI PASIR SILIKA DAN NATRIUM HIDROKSIDA MENGGUNAKAN PROSES BRUNNER MOND DENGAN KAPASITAS PRODUKSI 35.000 TON/TAHUN (Senja Angelita, 2019)
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI PASIR SILIKA DAN NATRIUM HIDROKSIDA MENGGUNAKAN PROSES BRUNNER MOND DENGAN KAPASITAS PRODUKSI 35.000 TON/TAHUN (Yuniar Ningsih, 2019)
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI PASIR SILIKA DAN NATRIUM HIDROKSIDA DENGAN KAPASITAS PRODUKSI 40.000 TON/TAHUN (AMMAR VIKO WICAKSONO, 2018)
PRARANCANGAN PABRIK NATRIUM SILIKAT DARI NATRIUM HIDROKSIDA DAN PASIR SILIKA DENGAN KAPASITAS PRODUKSI 50.000 TON/TAHUN (ALDI MUHAMMAD, 2023)