<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="154765">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Syifa Annisa Sabrina</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik Kimia</publisher>
   <dateIssued>2025</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik Ammonium Klorida menggunakan amonia dan asam klorida sebagai bahan baku. Proses produksi secara keseluruhan menggunakan proses direct neutralization. Kapasitas produksi sebesar 75.000 ton/tahun dengan waktu operasi 330 hari/tahun dan waktu 24 jam/hari. Pabrik ini direncanakan&#13;
dibangun di Kabupaten Gresik, Jawa Timur. Bentuk Perusahaan yang direncanakan&#13;
adalah Perseroan Terbatas (PT) dengan bentuk organisasi yaitu garis dan staff dan&#13;
tenaga kerja sebanyak 126 orang. Pemenuhan kebutuhan air untuk pabrik berasal&#13;
dari Sungai Begawan Solo dengan laju alir 70.276,517 Kg/jam. Kebutuhan Listrik&#13;
diperoleh dari generator dengan daya 86.615,56 kW. Hasil analisis Ekonomi&#13;
diperoleh sebagai berikut:&#13;
1. Fixed Capital Investment = Rp. 813.328.934.324,29&#13;
2. Working Capital Investment = Rp. 17.588.249.309,20&#13;
3. Total Capital Investment = Rp. 830.917.183.633,49&#13;
4. Total biaya produksi = Rp. 1.633.126.680.481,07&#13;
5. Hasil penjualan (SC) = Rp. 1.867. 910.573.952,18&#13;
6. Laba bersih = Rp 176.087.920.103,33&#13;
7. Pay Out Time (POT) = 3,23 tahun&#13;
8. Break Event Point (BEP) = 30,19%&#13;
9. Internal Rate of Return = 16,33%&#13;
10. Rate of Return = 21%&#13;
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat&#13;
disimpulkan bahwa Prarancangan pabrik Ammonium Klorida ini layak dilanjutkan&#13;
ke tahap rancangan.</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>154765</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2025-04-24 15:17:43</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2025-04-24 16:39:17</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>