<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="154687">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>MEILAN SOVIANTI</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik Kimia</publisher>
   <dateIssued>2025</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>ABSTRAK&#13;
&#13;
Prarancangan pabrik Ammonium Klorida menggunakan amonia dan asam klorida sebagai bahan baku. Proses produksi secara keseluruhan menggunakan proses direct neutralization. Kapasitas produksi sebesar 75.000 ton/tahun dengan waktu operasi 330 hari/tahun dan waktu 24 jam/hari. Pabrik ini direncanakan dibangun di Kabupaten Gresik, Jawa Timur. Bentuk Perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan bentuk organisasi yaitu garis dan staff dan tenaga kerja sebanyak 126 orang. Pemenuhan kebutuhan air untuk pabrik berasal dari Sungai Begawan Solo dengan laju alir 70.276,517 Kg/jam. Kebutuhan Listrik diperoleh dari generator dengan daya 86.615,56 kW. Hasil analisis Ekonomi diperoleh sebagai berikut:&#13;
&#13;
1.	Fixed Capital Investment		= Rp. 803.499.053.243,76&#13;
2.	Working Capital Investment		= Rp. 17.344.271.124,03&#13;
3.	Total Capital Investment		= Rp. 820.843.324.367,79&#13;
4.	Total biaya produksi			= Rp. 1.642.830.905.900,13&#13;
5.	Hasil penjualan (SC)			= Rp. 1.867.910.573.952,18&#13;
6.	Laba bersih   				= Rp 168.809.751.039,03&#13;
7.	Pay Out Time (POT)			= 3,29 tahun&#13;
8.	Break Event Point (BEP)		= 30,76%&#13;
9.	Internal Rate of Return		= 15,75%&#13;
10.	Rate of Return				= 21%&#13;
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat disimpulkan bahwa Prarancangan pabrik Ammonium Klorida ini layak dilanjutkan ke tahap rancangan.&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - MANUFACTURING TECHNOLOGY</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>154687</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2025-04-24 12:26:26</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2025-04-24 15:18:24</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>