<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="149447">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Rika Andriani</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2011</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan  pabrik  keju cheddar ini menggunakan  bahan baku susu sapi. Proses  produksi  secara  keseluruhan   menggunakan   proses   kontinyu   melibatkan proses  fermentasi susu  dengan  bantuan  bakteri Streptococcus  lactis dan Lactobacillus  bulgaris. Kapasitas  produksi pabrik  keju  cheddar  adalah  2.400  ton pertahun    dengan    masa   kerja   330   hari   pertahun.   Bentuk    perusahaan    yang direncanakan    adalah   Perseroan   Terbatas   (PT)   dengan   menggunakan    struktur organisasi  garis  dan  staf.  Kebutuhan  tenaga  kerja  untuk  menjalankan perusahaan&#13;
ini    berjumlah    132    orang.    Lokasi    pabrik   direncanakan   didirikan    di    Desa&#13;
&#13;
Nongkojajar,   Pulokerto,   Kabupaten   Pasuruan,   Jawa   Timur   dengan   luas   area&#13;
22.954  m2. Sumber   air  pabrik   ini   berasal   dari  Sungai   Welang   dengan     total kebutuhan  air  sebesar  42.764,2  kg/jam,  serta  untuk  memenuhi   kebutuhan  listrik&#13;
&#13;
sebesar  986,909 kW.&#13;
Hasil  analisa ekonomi  yang diperoleh  adalah sebagai  berikut. &#13;
a.    Fixed Capital Investment                :   Rp.       418.398.531.006&#13;
b.   Working Capital Investment           :Rp.         73.317.499.592&#13;
&#13;
C.  Total Capital Investment                 :   Rp.       491 .716.030.599 &#13;
d.    Total  Biaya Produksi                         :Rp.       195.460.593.292 &#13;
e.   Hasil Penjualan                                   :Rp.       493.111.110.613&#13;
 f.    Laba Bersih                                         :   Rp.       128.085.512.639&#13;
 g.    Pay Out Time (POT)                         :   2,23 tahun&#13;
h.    Break even Point (BEP)                   :  23%&#13;
&#13;
1.      Rate of Return (ROR)                       :  41,2%&#13;
&#13;
J.   Benefit Cost Ratio (BCR)                  :    I&#13;
&#13;
Berdasarkan  studi kelayakan teknis dan ekonomis di atas, maka dapat disimpulkan bahwa prarancangan   pabrik deterjen  cair ini  layak  untuk dilanjutkan ke tahap rancangan.&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>CHEESE - PROCESSING</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>149447</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2025-02-04 15:05:31</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2025-02-04 15:32:23</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>