LAPORAN KERJA PRAKTEK
PROYEK LANJUTAN KDP (KONSTRUKSI DALAM PENGERJAAN) UNIVERSITAS SYIAH KUALA
Pengarang
BADRYAN NAVIS - Personal Name;
Dosen Pembimbing
Febriyanti Maulina - 197802242008122002 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
2104001010023
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (D3) / PDDIKTI : 22401
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Sipil (D3)., 2025
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Kegiatan magang merupakan satu bentuk implementasi program Magang – MBKM (Merdeka Belajar Kampus Merdeka) yang mana suatu kegiatan pembelajaran dilapangan dan bertujuan untuk memperkenalkan dan menumbuhkan kemampuan mahasiswa/i dalam dunia kerja secara nyata. Penelitian ini berjudul “Proyek
Lanjutan KDP( Konstruksi Dalam Pengerjaan) Universitas Syiah Kuala”. Tinjauan khusus magang mencakup pekerjaan kolom,balok, pelat lantai, dan penjadwalan kusva S. Tujuan dari penelitian ini adalah untuk mengetahui kebutuhan besi balok dan pelat lantai, kebutuhan bekisting balok dan pelat lantai, kebutuhan volume
pengecoran balok dan pelat lantai, Serta penjadwalan kurva S. Metode pengumpulan data yang digunakan meliputi studi pustaka, wawancara, dan observasi lapangan. Metode pelaksanaan magang yang diterapkan mencakup studi spesifikasi serta gambar proyek, pengamatan lapangan, dan penulisan laporan
magang. Hasil penelitian ini menunjukkan kebutuhan besi, kebutuhan bekisting, dan volume beton pada pekerjaan balok dan pelat lantai.
Internship activities are a form of implementation of the Internship - MBKM (Merdeka Belajar Kampus Merdeka)program, which is a learning activity in the field and aims to introduce and foster the ability of students in the real world of work. This research is entitled “Advanced Project KDP (Construction in Progress) Syiah Kuala University”. Thespecificreview of the internship includes column work, beams, floor slabs, and scheduling kusva S. The purpose of this study is to determine the need for beam and floor slabiron, beam and floor slabformworkrequirements, beam andfloor slab castingvolume requirements, as well as scheduling curve S. The data collection methods used include literature study, interviews, and field observations. The internship implementation method applied includes studying project specifications and drawings, field observations, and writing internship reports. The results of this study show the need for iron, formwork requirements, and concrete volume in the work of beams and floor slabs.
PERENCANAAN JADWAL TENAGA KERJA PADA PROYEK PEMBANGUNAN SALURAN DRAINASE PIDIE JAYA LANJUTAN (PAKET III) DI KABUPATEN PIDIE JAYA (FEBRIZA RISKI PRATAMA, 2021)
ESTIMASI KEBUTUHAN MATERIAL PADA KOMPONEN STRUKTURAL DI PEKERJAAN LANJUTAN KONSTRUKSI DALAM PENGERJAAN (KDP) UNIVERSITAS SYIAH KUALA (T.M.Fajar Muharromi, 2024)
PROYEK PEMBANGUNAN LANJUTAN GEDUNG FAKULTAS KEDOKTERAN GIGI UNIVERSITAS SYIAH KUALA (Muhammad Aringga Darmawan, 2024)
PROYEK PEMBANGUNAN LANJUTAN KDP GEDUNG FAKULTAS KEDOKTERAN GIGI UNIVERSITAS SYIAH KUALA (RESKI HIDAYAT, 2024)
ANALISIS HUBUNGAN ARAH KOMUNIKASI INTERNAL TERHADAP KINERJA PROYEK KONSTRUKSI DI KOTA BANDA ACEH (TAAJ RAJA FAIZ MASRI, 2025)