<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="149213">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Eryani</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2009</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan  pabrik   furfural    ini  menggunakan ampas  tebu   sebagai  bahan   baku  utama.   Proses   produksi secara  keseluruhan menggunakan proses  kontinyu  dengan melibatkan proses   hidrolisa dan dehidrasi.  Kapasitas bahan baku  pabrik  furfural ini direncanakan 700  kg/hari dengan   hari  kerja 330  hari  pertahun.   Bentuk  perusahaan yang   direncanakan  adalah Perseroan Terbatas  (PT)   dengan  menggunakan metode struktur   organisasi   garis   dan  staff.     Kebutuhan   tenaga  kerja   untuk   menjalankan perusahaan ini  berjumlah 110 orang. Lokasi pabrik direncanakan didirikan di  daerah Aceh  Tamiang, Nanggroe Aceh  Darussalam,  dengan luas  tanah   15.000 m'. Sumber air  untuk  pabrik     furfural  ini  berasal   dari  Sungai   Tamiang dan  untuk   memenuhi  kebutuhan listrik diproleh  dari  generator dengan  daya  1.300kW.&#13;
&#13;
&#13;
Hasil analisa  ekonomi  yang  diperoleh adalah  sebagai berikut  :&#13;
I.   Fixed Capital Investment                                 = Rp  215.108.880.890.­&#13;
2.  Working Capital Investment                            = Rp     37.960.390.745.­&#13;
3.  Total  Capital Investment                                 =  Rp 253.069.271.636.­&#13;
4.   Total Biaya  Produksi                                       =  Rp   128.433.627.900.­&#13;
5.   Hasil  Penjualan                                                =  Rp  237.532.759.200,­&#13;
6.   Laba  bersih                                                      =  Rp     79.255.576.847,­&#13;
7.   Break Even  Point  (BEP)                                  = 48,00%&#13;
8.  Pay  Out  Time  (POT)                                       = 3tahun 9 bulan (3,9 tahun)&#13;
9. Internal Rate of  Return (IRR)                            = 25,66%&#13;
&#13;
Berdasarkan studi  kelayakan  teknis  dan  ekonomis di atas, maka  dapat  disimpulkan  bahwa perancangan pabrik furfural  ini layak  untuk dilanjutkan ke tahap konstruksi.&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>149213</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2025-01-24 15:25:10</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2025-01-24 15:36:19</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>