<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="149139">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Suherman</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2011</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik margarin dari  palm  oil hidrogenasi dengan  kapasitas  produksi  180.000  ton/tahun,  dengan   hari  kerja 300  hari  pertahun.   Bahan  baku utama  untuk memproduksi margarin  adalah  palm olein dan palm sterin.   Bentuk perusahaan   yang direncanakan  adalah Perseroan  Terbatas (PT)  dengan menggunakan  metode  struktur  organisasi  garis  dan   staf.    Tenaga  kerja   yang  dibutuhkan sebanyak   160 orang.   Lokasi   pabrik   direncanakan  di   desa   Peunaga Kecamatan Meureubo Kabupaten Aceh  Barat,   Aceh,  dengan  luas  tanah  26.400 m . Sumber air berasal   dari  Sungai  Meureubo dengan total  kebutuhan air sebesar  36.939,62  kg/jam, serta  untuk  memenuhi kebutuhan listrik   sebesar 158.834,28 kW  diperoleh dari  satu  unit  generator.&#13;
          Hasil   analisa ekonomi yang diperoleh adalah sebagai berikut:&#13;
          I.   Fixed Capital Investment                   = Rp.    197.258.198.772,­ &#13;
         2.   Working Capital Investment              =  Rp.    29.353.898.627,­&#13;
         3.   Total Capital Investment                    =  Rp    226.612.097.399.­&#13;
         4.   Total Production Cost                         =  Rp.    282.176.780.990,­ &#13;
         5.   Hasil Penjualan                                   =  Rp.  358.800.000.000,­&#13;
         6.   Laba  bersih                                        =  Rp     48.097.254.056,­&#13;
         7.   Rate  of Return (ROR)                        =  15%&#13;
         8.  Waktu  Pengembalian  Modal  &#13;
              (Payout Time. POT)                             = 4,6 tahun&#13;
         9.  Break Event Point  (BEP)                     =  40%&#13;
&#13;
          Berdasarkan  studi   kelayakan  teknis   dan  ekonomis  di  atas,   maka  dapat  disimpulkan  bahwa prarancangan pabrik margarin dari  palm  oil  hidrogenasi  ini  layak  dilanjutkan ke tahap  konstruksi.&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>149139</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2025-01-24 09:40:55</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2025-01-24 10:23:01</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>