Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA HYBRID GRID-CONNECTED UNTUK GEDUNG B FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA
Pengarang
SYAUQI MUBARAK - Personal Name;
Dosen Pembimbing
Ira Devi Sara - 197705252001122001 - Dosen Pembimbing I
Hafidh - 197205021999031003 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1804105010080
Fakultas & Prodi
Fakultas Teknik / Teknik Elektro (S1) / PDDIKTI : 20201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Elektro dan Komputer., 2025
Bahasa
Indonesia
No Classification
621.312 44
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Pembangkit listrik tenaga surya (PLTS) dapat digunakan menjadi sumber daya yang alternatif dan inovatif yang dapat digunakan untuk mengatasi terjadinya krisis energi akibat peningkatan energi fosil dengan rata-rata 5% per- tahunnya. Gedung B pada Fakultas Teknik USK sepenuhnya masih menggunakan sumber energi listrik yang berasal dari PLN masih berbahan bakar fosil. Berdasarkan hasil penelitian yang telah dilakukan Perencanaan Sistem PLTS rooftop grid-connectd yang akan direncanakan pada atap Gedung B Fakultas Teknik USK dengan total luas atap yang tersedia yaitu sebesar 1897,2 m² dengan menggunakan kondisi atap yang sebenarnya serta mempertimbangkan jalur pemeliharaan sebesar 5% sehingga besar daya yang dihasilkan pv yaitu sebesar 335,24 kWp, dengan menggunakan ukuran panel yang berkapasitas 530 Wp sebanyak 788 modul panel surya. Sehingga Ppv total yang dihasilkan dalam waktu 1 hari yaitu sebesar 1.132,60 kWh per hari. Perencanaan Sistem PLTS rooftop hybrid grid-connected pada atap Gedung B Fakultas Teknik USK berdasarkan sizing atau instalasi terpasang menggunakan panel surya berkapasitas 530 Wp dan inverter hybrid berkapasitas 270 kW, dengan perhitungan daya puncak dan Pvout yang diketahui dari hasil simulasi Global Solar Atlas (GSA), sehingga Ppv total yang dihasilkan dalam waktu 1 hari yaitu sebesar 875,44 kWh per hari. Berdasarkan hasil perhitungan peyback periode pemasangan PLTS Hybrid dengan PLN di Gedung B Fakultas Teknik USK dengan investasi awal sebesar Rp 2.545.310.304 dengan pendapatan pertahun yaitu sebesar Rp 361.297.381 serta biaya operasional dan perawatan yang diperlukan dalam 1 tahun yaitu sebesar Rp.25.453.103. Biaya investasi awal untuk perancanaan PLTS pada Gedung B akan kembali tahun ke 7 bulan ke 5.
Kata kunci : Energi Terbarukan, PLTS, sistem Hybrid, eksisting, perhitungan, prioritas beban.
Solar power plants (PLTS) can be used as an alternative and innovative resource that can be used to overcome the energy crisis due to the increase in fossil energy by an average of 5% per year. Building B at the USK Faculty of Engineering still fully uses electrical energy sources derived from PLN still made from fossil fuels. Based on the results of the research that has been done, the grid-connectd rooftop PLTS System Planning will be planned on the roof of Building B of the USK Faculty of Engineering with a total available roof area of 1897.2 m² using the actual roof conditions and considering a maintenance path of 5% so that the amount of power generated by PV is 335.24 kWp, using a panel size with a capacity of 530 Wp as many as 788 solar panel modules. So that the total Ppv generated within 1 day is 1,132.60 kWh per day. Planning for a grid-connected hybrid rooftop solar PV system on the roof of Building B of the USK Faculty of Engineering based on sizing or installed installation using solar panels with a capacity of 530 Wp and a hybrid inverter with a capacity of 270 kW, with peak power calculations and Pvout known from the Global Solar Atlas (GSA) simulation results, so that the total Ppv generated within 1 day is 875.44 kWh per day. Based on the results of the calculation of the peyback period of installing PLTS Hybrid with PLN in Building B of the USK Faculty of Engineering with an initial investment of Rp. 2,545,310,304 with an annual income of Rp. 361,297,381 and the operational and maintenance costs required in 1 year are Rp. 25,453,103. The initial investment cost for PLTS planning in Building B will return year 7 month 5. Keywords: Renewable Energy, PLTS, Hybrid system, existing, calculation, load prioritization.
DESAIN SINKRONISASI INVERTER PADA GRID SATU FASA METODE ZERO CROSSING (Ramona Safitri, 2016)
DESAIN MULTILEVEL INVERTER CONNECTED GRID BERBASIS MIKROKONTROLER PIC 16F877 APLIKASI PADA SOLAR SEL (T.Wira Ardebili, 2023)
STUDI POTENSI PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA HYBRID (SURYA-BAYU) DI BANDA ACEH MENGGUNAKAN METODE JARINGAN SYARAF TIRUAN (T. Syaufi Hayu, 2018)
RANCANGAN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA UNTUK POMPA AIR IRIGASI (Mukhtar Riyandri Tarigan, 2019)
STUDI KELAYAKAN ENERGI MATAHARI SEBAGAI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) DI PULAU WEH SABANG (Sadam Husin, 2017)