<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="141113">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Yeni Afria Ningsih</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2010</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan  pabrik etil klorida ini menggunakan  etanol dan HCI  sebagai  bahan baku   utama.  Proses    produksi     secara  keseluruhan  menggunakan    proses  kontinyu dengan  melibatkan  proses hidrogenasi.  Kapasitas produksi  pabrik  etil  klorida  ini dircncanakan  35.000  ton  pcrtahun dengan   waktu   operasi  330  hari/tahun dan  24 jam/hari.  Bentuk  perusahaan yang  direncanakan adalah   Perseroan Terbatas (PT) dengan  menggunakan  metode  struktur organisasi  garis.  Kebutuhan  tanaga  kerja untuk   menjalankan   perusahaan   ini    berjumlah  160   orang.   Lokasi   pabrik direncanakan  didirikan di  Cilegon,  Kabupaten  Banten,  Provinsi  Jawa  Barat, dengan  luas  tanah 26.000  Sumber  air  untuk  pabrik  ini berasal  dari  Sungai Cisadane.&#13;
&#13;
Hasil analisa ekonomi  yang  yang  diperoleh adalah sebagai berikut :&#13;
 I .   Fixed Capital Investment                                  =  Rp     278.545.050.388.­&#13;
2.   Working Capital Investment                              =  Rp       49.155.008.892.­&#13;
3.    Total Capital Investment                                   =  Rp     327.700.059.280.­&#13;
4.   Total  Biaya Produksi                                         =  Rp  1.392.354.232.759.­&#13;
5.    Hasil  Penjualan                                                 =  Rp  I .883.933.903.069.-&#13;
6.   Laba bersih                                                         =  Rp     371.960.274.256.-&#13;
7.   Internal Rate  of Return(RR)                              = 52,53%&#13;
8.   Break Event poin (BEP)                                      =  48%&#13;
9.   Pay Ou Time  (POT)                                            = 2  tahun I  bulan&#13;
&#13;
Berdasarkan    studi   kelayakan    teknis   dan   ekonomis   di   atas,    maka   dapat &#13;
disimpulkan bahwa  prarancangan   pabrik  etil  klorida  ini layak  untuk  dilanjutkan &#13;
ke tahap perancangan.&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING INDUSTRIES</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>141113</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2024-11-18 10:42:13</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-11-18 10:53:02</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>