<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="140837">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Ernawati</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2012</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik  furfural  dengan  menggunakan tandan   kosong  kelapa sawit   sebagai   bahan   baku.   Proses  produksi   secara  keseluruhan   menggunakan  proses kontinyu dengan  melibatkan  proses pretreatment, hidrolisis,  dehidrasi dan refining (pemurnian).  Kapasitas   produksi   pabrik  furfural  ini  adalah   1.600  ton pertahun    dengan    hari    kerja   330   hari    pertahun.   Bentuk    perusahaan   yang direncanakan  adalah   Perseroan  Terbatas  (PT)    dengan   menggunakan  metode struktur   organisasi   garis   dan  staf.   Kebutuhan   tanaga   kerja  untuk   menjalankan perusahaan  ini  berjumlah  11 5  orang.  Lokasi   pabrik   direncanakan  didirikan   di Desa  Tanjung Seumantoh,  Kecamatan  Karang   Baru,  Kabupaten Aceh  Tamiang, Propinsi  Aceh, dengan  luas  tanah 15.000  m'.  Sumber air untuk  pabrik  furfural  ini berasal  dari  Sungaip  Tamiang.&#13;
&#13;
Hasil analisa ekonomi  yang yang  diperoleh  adalah  sebagai berikut  :&#13;
&#13;
a.    Fixed Capital Investment                          = Rp.    307.454.153.194&#13;
b.    Working Capital Investment                      = Rp.      54.256.615.270&#13;
c.   Total Capital Investment                              = Rp.    36I.710. 768.463&#13;
d.   Total  Biaya  Produksi                                  =  Rp.     643.133.334.201&#13;
e.    Hasil  Penjualan                                           =   Rp.    786.790.000.000 &#13;
f.   Laba  Bersih                                                   = Rp.       59.583.585.064 &#13;
g.   Pay Out  Time  (POT)                                    =  2 tahun  6 bulan&#13;
h.   Break even Point  (BEP)                                =  49,59%&#13;
I.    Internal Rate  of Return (RR)                        = 28.3%&#13;
&#13;
Berdasarkan  studi   kelayakan  teknis   dan   ekonomis   di  atas,   maka   dapat disimpulkan bahwa  prarancangan  pabrik   furfural  ini  layak  untuk  dilanjutkan   ke tahap  konstruksi.&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING INDUSTRIES</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>140837</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2024-11-14 11:21:31</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-11-25 14:55:59</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>