<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="140663">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Brian Marchsal</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2010</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik Zeolit aktivasi ini menggunakan  batuan zeolit alam sebagai&#13;
bahan baku utama. Proses produksi pabrik menggunakan proses  Pemanasan.  Kapasitas&#13;
 produksi adalah sebesar  37.976,64 ton/ tahun dengan waktu  operasi 330 hari/tahun dan&#13;
24 jam/hari.  Bentuk  perusahaan  yang  direncanakan  adalah  Perseroan  Terbatas  (PT) &#13;
dengan menggunakan metode struktur organisasi garis dan staf.  Kebutuhan tenaga kerja &#13;
untuk  menjalankan  perusahaan  ini berjumlah  124 orang. Lokasi  pabrik  direncanakan &#13;
didirikan di Pegunungan  Semaleuh, Dusun Buhang, Desa Ladang Sinebok, Kecamatan&#13;
 Blangpidie, Kabupaten  Aceh  Beret Daya, Provinsi Aceh.  Sumber air untuk kebutuhan &#13;
Pabrik ini berasal dari  Sungai Krueng Kuala Batee den  untuk memenuhi kebutuhan &#13;
listrik diperoleh dari 2 generator   dengan daya total  sebesar  425,55 kW. Dari hasil &#13;
analisa ekonomi Prarancangan Pabrik Zeolit Aktivasi  dengan kapasitas 37.976,64  ton/&#13;
tahun diperoleh sebagai berikut:&#13;
          a.  Fixed Capital Investment (FCI)                      =  Rp. 73.005.126.502,­&#13;
          b.  Working Capital Investment (WCI)               =  Rp 12.883.257.618,­&#13;
          c.  Total Capital Investment (TCI)                       =  Rp. 85.888.384.120,-­&#13;
          d. Total  Production Cost  (TPC)                         =  Rp. 88.348.153.244,­&#13;
          e.  Laba Bersih                                                     =  Rp  18.750.893.062,­&#13;
          f.   Pay Out Time  (POT)                                      =   2,01  tahun&#13;
          g.  Break  Event  Point (BEP)                               = 46,79 %&#13;
          h.  Internal Rate ofReturn (IRR)                          =  33,13 %&#13;
&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>ZEOLITE - MINERALOGY</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING INDUSTRIES</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>140663</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2024-11-13 10:22:02</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-11-13 10:28:52</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>