<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="140633">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>MIMI RAHMATAN KHAIRA</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik Kimia</publisher>
   <dateIssued>2024</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik Minyak Jagung ini mengguanakan biji jagung sebagai bahan baku. Kapasitas produksi pabrik Minyak Jagung sebesar 4.000 Ton/Tahun dengan hari kerja 330 hari/tahun dan waktu operasi 24 jam/hari. Pabrik ini direncanakan di bangun di Desa Dolok Hataran, Kecamatan Siantar, Kabupaten Simalungun, Provinsi Sumatera Utara, Indonesia dengan luas area pabrik 17.550 m2. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi garis dan staf dan tenaga kerja sebanyak 120 orang. Kebutuhan air untuk pabrik berasal dari Sungai Bah Bolon dengan laju alir 2.481 kg/jam, dan untuk kebutuhan listrik diperoleh dari generator dengan daya 902 kW.&#13;
Hasil analisis ekonomi diperoleh sebagai berikut:&#13;
1.	Fixed Capital Investment (FCI) 	= Rp 453.297.484.436,-&#13;
2.	Working Capital Investment (WCI) 	= Rp 113.324.371.109,- &#13;
3.	Total Capital Investment (TCI) 	= Rp 566.621.855.545,- &#13;
4.	Total Production Cost (TPC) 		= Rp 781.235.716.716,-&#13;
5.	Sales Cost (SC) 			= Rp 1.010.771.478.361,- &#13;
6.	Laba Bersih 				= Rp 179.037.894.083,-&#13;
7.	Pay Out Time (POT)			= 4,5 tahun &#13;
8.	Break Event Point (BEP) 		= 36,01% &#13;
9.	Internal Rate of Return (IRR) 	= 23,47%</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>CORN - COMMERCIAL PROCESSING</topic>
 </subject>
 <subject authority="">
  <topic>OILS - INDUSTRIAL</topic>
 </subject>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING INDUSTRIES</topic>
 </subject>
 <classification>664.724</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>140633</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2024-11-12 12:47:53</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-11-13 10:38:10</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>