<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="140293">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Sri Humaida</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2011</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik deterjen cair ini menggunakan bahan baku serbuk &#13;
tempurung kelapa. Proses produksi secara keseluruhan menggunakan proses &#13;
kontinyu melibatkan proses pemasakan serbuk tempurung kelapa dengan&#13;
menggunakan larutan natrium bisulfit. Kapasitas produksi pabrik deterjen cair&#13;
adalah I 1.300 ton pertahun dengan masa kerja 330 hari pertahun. Bentuk&#13;
perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan&#13;
menggunakan struktur organisasi garis dan staf. Kebutuhan tenaga kerja untuk &#13;
ini menjalankan perusahaan berjumlah 175 orang. Lokasi pabrik direncanakan &#13;
didirikan di Desa Lueng Daneun, Kecamatan Peusangan Siblah Krueng&#13;
Kabupaten Bireuen, Provinsi Aceh, dengan luas area 20.535 m. Sumber air&#13;
pabrik ini berasal dari sungai Krucng Peusangan dengan total kebutuhan air&#13;
sebesar 22.649,6 kg/jam, serta untuk memenuhi kebutuhan listrik sebesar 1,379&#13;
MW diperoleh dari satu uni t generator diesel 2 MW.&#13;
          Hasil analisa ekonomi yang diperoleh adalah sebagai berikut. &#13;
a.Fixed Capital Investment                     : Rp. 96.693. 778.657 &#13;
b.Working Capital Investment                : Rp. 16.944.003.269 &#13;
c.Total Capital Investment                       : Rp. 113.637.781.926 &#13;
d.Total Biaya Produksi                             : Rp. 68.052.888. 789 &#13;
e. Hasil Penjualan                                     : Rp. 119.743.249.194 &#13;
f.  Laba Bersih                                           : Rp. 34.042.998.206 &#13;
g. Pay Out Time (POT)                             : 3,19 tahun &#13;
h.Break even Point (BEP)                         : 46,97% &#13;
I.Rate of Return (ROR)                             : 23,98% &#13;
j.­Benefit Cost Ratio (BCR)                        : I, I &#13;
          Berdasarkan studi kelayakan teknis dan ekonomis di atas , maka dapat &#13;
disimpulkan bahwa prarancangan pabrik deterjen cair ini layak untuk dilanjutkan &#13;
ke tahap rancangan. &#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>LIQUID SOAPS</topic>
 </subject>
 <classification>668.124</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>140293</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2024-11-07 16:09:37</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-11-08 10:16:58</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>