<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="139577">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Nanda Suhada</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2010</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan  Pabrik   Minyak  Sawit   Mentah  (Crude   Palm   Oil)   ini dirancang untuk  mengolah Sumber Daya Alam  (SDA)  berupa kelapa sawit yang terdapat  di  Provinsi  Aceh,  khususnya di  Desa  Lubuk Tilam.  Kecamatan Cot Girek, Kabupaten Aceh Utara. Produk dari prarancangan pabrik ini direncanakan untuk memenuhi kebutuhan dalam dan luar negeri.  Proses produksi secara keseluruhan menggunakan proses kontinyu. Adapun metode proses yang digunakan pada prarancangan pabrik ini adalah metode pengepresan berulir (expeller   pressing)   dengan  perlakuan   pendahuluan   yang  terdiri   dari   proses perebusan di  dalam sterilizer,  pencobahan di  dalam  thresher, dan pengadukan di dalam digester.  Dari  hasil  pcrhitungan neraca massa dan energi, jumlah  Tandan Buah Segar (TBS) yang diperlukan untuk memproduksi  minyak sawit mentah (Crude  Palm  Oil) adalah  sebesar 7.922,6071  kg/jam.  Kapasitas  produksi pabrik ini adalah  sebesar 40 ton/hari dan direncanakan beroperasi  secara kontinyu  selama&#13;
330 hari dalam setahun.  Pendirian pabrik  direncanakan  di  Desa Lubuk Tilam,&#13;
Kecamatan  Cot Girek, Kabupaten Aceh Utara, Provinsi  Aceh,  dengan luas  tanah&#13;
18.200    m2  dan   membutuhkan  tenaga   kerja   sebanyak   156    orang.    Bentuk&#13;
perusahaan yang direncanakan adalah  Perseroan Terbatas (PT) dengan metode&#13;
struktur organisasi garis dan staf. Sumber air untuk kebutuhan pabrik  ini berasal dari  sungai  Krueng Pasee  dan untuk memenuhi kebutuhan listrik diperoleh  dari generator dengan daya 2.000 kW.&#13;
Hasil analisa ckonomi yang diperoleh adalah sebagai  berikut:&#13;
 a.    Biaya tetap (Fixed Cost,  FC)                               =  Rp  12.303.772.490&#13;
 b.   Biaya variabel (Variable  Cost, VC)                         =  Rp 42.077.890.412 &#13;
c.    Biaya semi variabel  (Semi  Variable Cost,  SVC)             =  Rp 38.122.030.684&#13;
 d.    Biaya start up pabrik                                                         =Rp     8.685.015.875&#13;
e.    Pajak lokal                                                                          =Rp       984.301.799 &#13;
f.	Asuransi                                                                              =  Rp       492.150.900 &#13;
g.    Depresiasi                                                                              =  Rp    5.905.810.795&#13;
 h.    Biaya tak terduga, 15% dari  FCI                                          =  Rp    7.382.263.494 &#13;
i.     Modal awal (Total Capital Investment, TC)                    =  Rp  57.900.105.835&#13;
 j.    Harga penjualan                                                                  =  Rp 112.660.382.292&#13;
 k.    Keuntungan kotor                                                              =  Rp 21.970.486.620&#13;
I.     Keuntungan bersih                                                             =Rp   15.3 79 .340.634 &#13;
m. Rate ofReturn (ROR)                                                        =  26,56%&#13;
n.    Pay Out Time (POT)                                                         =  2,72 tahun&#13;
o.    Benefit Cost Ratio (BCR)                                                  =  1,94&#13;
p.   Break Event Point(BEP)                                                   =  54,08%&#13;
q.   Internal Rate ofReturn(IRR)                                            =  32,65%&#13;
Berdasarkan  studi   kelayakan  teknis  dan  ekonomis  diatas,   maka  dapat&#13;
disimpulkan bahwa Prarancangan Pabrik Minyak Sawit Mentah (Crude Palm Oil)&#13;
ini  layak  untuk dilanjutkan  ketahap perancangan.&#13;
&#13;
&#13;
</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>PALM OIL - FOOD TECHNOLOGY</topic>
 </subject>
 <classification>664.36</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>139577</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2024-10-28 15:38:48</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-10-29 10:58:01</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>