<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="136039">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>T M Zakiul Fuad</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Banda Aceh</placeTerm>
   <publisher>Fakultas Teknik</publisher>
   <dateIssued>2012</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Skripsi</form>
  <extent></extent>
 </physicalDescription>
 <note>Prarancangan pabrik kimia ini yaitu Prarancangan Pabrik Sabun Mandi Cair Dari  Crude Palm Oil&#13;
(CPO) Dengan Kapasitas Produksi 50.000 Ton/Tahun. Sabun  mandi ini  cair  menggunakan bahan baku utama minyak kelapa  sawit (Crude Palm  Oil). Proses produk si secara keseluruhan menggunakan proses kontinyu dengan&#13;
melibatkan proses utama saponifikasi langsung trigliserida dan proses ini  berlangsung selama 330 hari pertahun. Bentuk perusahaan yang direncanakan  adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur organisasi &#13;
garis dan staff, Kebutuhan tanaga kerja untuk menjalankan perusahaan ini  berjumlah 200 orang. Lokasi pabrik direncanakan didirikan di Desa Banten, Kecamatan Cot Girek, Kabupaten Aceh Utara, Nanggroe Aceh Darussalam, &#13;
dengan luas tanah 20.620 m'. Sumber air untuk pabrik sabun mandi cair ini berasal dari Sungai Krueng Keureuto, dan untuk memenuhi kebutuhan listrik diperoleh dari PLN dengan daya 1,167,296 kW. &#13;
Hasil analisa ekonomi yang diperolch adalah sebagai berikut: &#13;
          a. Fixed Capital Investment (F CI)            :Rp 255.597.354.008,­ &#13;
          b. Working Capital Investment (WCI)      :Rp 63,899.337.502,­ &#13;
          c.Total Capital Investment TCI)                :Rp 319.496.692.510,­ &#13;
          d. Total Biaya Produksi                             : Rp 1.768.852.647.087,­ &#13;
          e. Marga Penjualan Produk                      : Rp 1960.000.035.840,­ &#13;
          f. Laba Bersih                                             : Rp 133.803.172.127.- &#13;
          g. Pay Out Time (POT                                : 1,94 Tahun &#13;
          h. Break Even Point (BEP)                          : 49,95% &#13;
           i.Internal Rate of Return (IRR)                  : 46.38% &#13;
          J. Benefit Cost Rasio (BCR)                        :1.25 &#13;
Berdasarkan studi kelayakan teknis dan ekonomis di atas, maka dapat&#13;
disimpulkan bahwa prarancangan pabrik sabun mandi cair ini layak untuk&#13;
dilanjutkan ke tahap perancangan.</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>SOAPS</topic>
 </subject>
 <subject authority="">
  <topic>CHEMICAL INDUSTRIES - TECHNOLOGY</topic>
 </subject>
 <subject authority="">
  <topic>FACTORIES - MANUFACTURING INDUSTRIES</topic>
 </subject>
 <classification>660</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>ELECTRONIC THESES AND DISSERTATION Universitas Syiah Kuala</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <slims:digitals/>
</mods>
<recordInfo>
 <recordIdentifier>136039</recordIdentifier>
 <recordCreationDate encoding="w3cdtf">2024-10-07 12:08:54</recordCreationDate>
 <recordChangeDate encoding="w3cdtf">2024-11-22 16:29:10</recordChangeDate>
 <recordOrigin>machine generated</recordOrigin>
</recordInfo>
</modsCollection>