Electronic Theses and Dissertation
Universitas Syiah Kuala
LAPORAN KERJA PRAKTEK
PEMBANGUNAN GEDUNG BADAN PENGELOLAAN KEUANGAN ACEH TAHAP II
Pengarang
RAIHAN AFWADI - Personal Name;
Dosen Pembimbing
Huzaim - 196603201992031003 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
2004001010011
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (D3) / PDDIKTI : 22401
Penerbit
Banda Aceh : Fakultas Teknik Sipil (D3)., 2024
Bahasa
Indonesia
No Classification
690
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Dalam penulisan laporan kerja praktek Lapangan / Magang ini di Perusahaan swasta PT. Pitra Sari Rahayu, penulis membahas mengenai pekerjaan Struktur Balok, Kolom, dan Plat Lantai pada Pembangunan Gedung Badan Pengelola Keuangan Aceh Tahap II yang beralamat di Jln. T. Nyak Arief No. 219 Syiah Kuala, Kota. Banda Aceh, Provinsi Aceh. Dimana pada proyek ini gedung terdiri dari 8 lantai yang berfungsi sebagai tempat penyimpanan data-data. Tujuan dari kerja praktik ini adalah penulis dapat mengaplikasikan materi atau pengetahuan yang di dapat di bangku perkuliahan, penulis dapat mengetahui masalah-masalah yang terjadi dan solusi dari masalah tersebut selama kerja praktik pekerjaan yang penulis amati adalah pekerjaan struktur tengah yang meliputi kolom, balok, dan plat lantai. Selama penulis melaksanakan kegiatan kerja praktik, secara umum proses pembangunan berjalan dengan lancar sesuai dengan rencana kerja yang sudah disepakati.
In writing this Field Work Practice / Internship report at the private company PT. Pitra Sari Rahayu, the author discusses the work of Beam, Column, and Floor Plate Structures in the Construction of the Aceh Financial Management Agency Building Phase II located at Jln. T. Nyak Arief No. 219 Syiah Kuala, Banda Aceh City, Aceh Province. Where in this project the building consists of 8 floors which function as a place to store data. The purpose of this internship is that the author can apply the material or knowledge obtained in the lecture bench, the author can find out the problems that occur and the solutions to these problems during the internship work that the author observed was the middle structure work which included columns, beams, and floor plates. During the author's internship activities, in general the construction process went smoothly according to the agreed work plan.
PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG (RIFAT ADITYA HAWARI, 2020)
PENGARUH KESEJAHTERAAN, SELF-EFFICACY DAN LINGKUNGAN KERJA TERHADAP KINERJA PEGAWAI DAN DAMPAKNYA PADA KINERJA BADAN PENGELOLAAN KEUANGAN ACEH (JONNY RAHMADI, 2019)
THE IMPACT OF BREADTH OUTREACH AND DEPTH OUTREACH ON THE FINANCIAL SUSTAINABILITY OF MICROFINANCE INSTITUTIONS (STUDY ON MICROFINANCE INSTITUTIONS IN ASEAN LISTED IN MICROFINANCE INFORMATION EXCHANGE MARKET YEAR 2010-2014 (Dhien Auliatu Asra, 2016)
PENGARUH KARAKTERISTIK PEKERJAAN DAN DUKUNGAN ORGANISASITERHADAP LOYALITAS PEGAWAI DAN DAMPAKNYA TERHADAP KOMITMEN ORGANISASI PADA BAD AN PENGELOLAAN KEUANGAN ACEH (NORA AMALIA, 2019)
ANALISIS SISTEM INFORMASI MANAJEMEN KEUANGAN DAERAH SIMDA-KEUANGAN TERHADAP EFEKTIVITAS PENYUSUNAN LAPORAN KEUANGAN KABUPATEN PADA BADAN PENGELOLAAN KEUANGAN KABUPATEN ACEH TENGAH (Viky Mega Fellashova, 2021)