Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PRARANCANGAN PABRIK MAGNESIUM OKSIDA DARI BITTERN DAN BATU KAPUR DENGAN KAPASITAS PRODUKSI 13.000 TON/TAHUN
Pengarang
TASYA FADHILAH - Personal Name;
Dosen Pembimbing
Yanna Syamsuddin - 196901131998022001 - Dosen Pembimbing I
Sri Aprilia - 196704121993032001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
1704103010070
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Kimia., 2024
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik Magnesium Oksida menggunakan bahan baku batu kapur dan bittern. Batu kapur diperoleh dari tambang batu kapur di Kabupaten Tuban, Provinsi Jawa Timur sementara itu bittern diperoleh dari PT. Cheetam Garam Indonesia di Kota Cilegon, Banten. Kapasitas produksi pabrik ini adalah 13.000 ton/tahun dengan hari kerja 330 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 111 orang. Rencana pendirian pabrik di daerah Kotasari, Kecamatan Purwakarta, Kota Cilegon, Banten dengan luas area 18.200 m2. Sumber air pabrik ini berasal dari Sungai Pasean, Provinsi Jawa Timur dengan total kebutuhan air sebesar 16.595,754 kg/jam, serta untuk memenuhi kebutuhan listrik sebesar 792,754 kW/jam diperoleh dari generator diesel.
Hasil analisa ekonomi yang diperoleh adalah sebagai berikut:
1. Fixed Capital Investment = Rp 364.041.839.666,-
2. Working Capital Investment = Rp 91.010.459.916,-
3. Total Capital Investment = Rp 455.052.299.582,-
4. Total Production Cost = Rp 182.020.919.833,-
5. Sales Cost = Rp 357.333.942.631,-
6. Laba Bersih = Rp 131.003.072.895,-
7. Pay Out Time = 3,4 tahun (Metode linear)
8. Break Event Point = 28,4% (Metode cash flow)
9. Internal Rate of Return = 19,87% (Metode cash flow)
Magnesium oxide plant design uses limestone and bittern as raw materials. The limestone is obtained from limestone quarry, in Tuban district, East Java Province and bittern are obtained from PT. Cheetam Garam Indonesia, in Cilegon City, Banten. The capacity of this production plant is 13.000 tons/year with 330 working days/year. The planned form of this company is an Incorporated (Inc.) using the line and staff structure method. The required number of workers to run this company is 111 people. The factory location is planned to be established in Kotasari, Banten City with an area is 18,200 m2. The water source for this factory comes from Pasean River, East Java Province, with the water needed is 16,595.54 kg/hour, and also to fulfil 792.754 kW/hour electricity is needed from a diesel generator. The result of the economic analysis obtained are as follows: 1. Fixed Capital Investment = Rp 364.041.839.666,- 2. Working Capital Investment = Rp 91.010.459.916,- 3. Total Capital Investment = Rp 455.052.299.582,- 4. Total Production Cost = Rp 182.020.919.833,- 5. Sales Cost = Rp 357.333.942.631,- 6. Laba Bersih = Rp 131.003.072.895,- 7. Pay Out Time = 3,4 tahun (Metode linear) 8. Break Event Point = 28,4% (Metode cash flow) 9. Internal Rate of Return = 19,87% (Metode cash flow)
PRARANCANGAN PABRIK MAGNESIUM HIDROKSIDA MG(OH)2 DARI BATU KAPUR DAN BITTERN DENGAN KAPASITAS PRODUKSI 4.500 TON/TAHUN (SAZA ANAYA, 2022)
PRARANCANGAN PABRIK MAGNESIUM HIDROKSIDA MG(OH)2 DARI BATU KAPUR DAN BITTERN DENGAN KAPASITAS PRODUKSI 4.500 TON/TAHUN (YUSRI DELIA NOVITA, 2022)
PRARANCANGAN PABRIK MGO DARI BATUAN DOLOMIT DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN (M.Reza Hani/ Bayu Pramana Putra, 2024)
PRARANCANGAN PABRIK MAGNESIUM OKSIDA (MGO) DARI DOLOMIT MENGGUNAKAN PROSES LEACHING DENGAN KAPASITAS 40.000 TON/TAHUN (ARIFAH FITRI, 2025)
PRARANCANGAN PABRIK MAGNESIUM OKSIDA (MGO) DARI DOLOMIT MENGGUNAKAN PROSES LEACHING DENGAN KAPASITAS 40.000 TON/TAHUN (RIFKA AULIA PUTRI, 2025)