Electronic Theses and Dissertation
Universitas Syiah Kuala
SKRIPSI
PRARANCANGAN PABRIK ALUMINIUM SULFAT DARI BAUKSIT MELALUI PROSES DORR DENGAN KAPASITAAS PRODUKSI 48.000 TON/TAHUN
Pengarang
Fathia Zahira Fauzi - Personal Name;
Dosen Pembimbing
Yanna Syamsuddin - 196901131998022001 - Dosen Pembimbing I
Sri Mulyati - 197302272000122001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
2004103010092
Fakultas & Prodi
Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Kimia., 2024
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Prarancangan pabrik Aluminium sulfat menggunakan bauksit dan asam sulfat sebagai bahan baku. Proses produksi secara keseluruhan menggunakan proses dorr yang menggunakan 2 unit reaktor CSTR dan reaksi yang bersifat endotermis (menyerap panas). Produk yang keluar dari Reaktor I (R-101) akan masuk kedalam Reaktor II (R-102) yang direaksikan dengan Barium Sulfida untuk mereduksi Fe¬2(SO4)3 agar mudah dilakukan pemisahan. Kemudian slurry Aluminium Sulfat akan dipompa menuju Rotary Drum Vakuum Filter (RDVF-101) untuk dilakukan pemisahan padatan dan cairan dari produk Aluminium Sulfat sebelum produk dipekatkan konsentrasinya di dalam Evaporator (EV-101). Lalu dipompa menuju Spray Dryer (SD-101) untuk pengeringan dan merubah fasa dari bentuk cairan menjadi powder. Kemudian Produk diseragamkan ukurannya didalam Ball Mill (BM-102) yang selanjutnya akan dibawa oleh belt coveyor dan bucket elevator untuk disimpan didalam silo Aluminium Sulfat sebelum dilakukan pengepakan dan disimpan didalam Gudang Penyimpanan. Kapasitas produksi sebesar 48.000 ton/tahun dengan waktu operasi 330 hari/tahun dan waktu 24 jam/hari. Pabrik ini direncanakan dibangun di Kawasan Industri Cilegon, Kota Cilegon, Banten dengan luas 126.000 m2. Bentuk Perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan bentuk organisasi yaitu garis dan staff dan tenaga kerja sebanyak 133 orang. Pemenuhan kebutuhan air untuk pabrik berasal dari PDAM Tirta Cilegon Mandiri dengan laju alir 32.460,72513 Kg/jam. Kebutuhan Listrik diperoleh dari generator dengan daya 226.629,4 kW. Hasil analisis Ekonomi diperoleh sebagai berikut:
1. Fixed Capital Investment = Rp 318.493.263.351,36
2. Working Capital Investment = Rp 35.388.140.372,37
3. Total Capital Investment = Rp 353.881.403.723,74
4. Total biaya produksi = Rp 492.116.569.769,10
5. Hasil penjualan (SC) = Rp 607.673.204.954,20
6. Laba bersih = Rp 80.889.644.629,57
7. Pay Out Time (POT) = 3,1 tahun
8. Break Event Point (BEP) = 38,24 %
9. Internal Rate of Return = 16,97 %
10. Rate of Return = 23%
Berdasarkan studi kelayakan teknis dan ekonomis diatas, maka dapat disimpulkan bahwa Prarancangan pabrik aluminium sulfat ini layak dilanjutkan ke tahap rancangan.
The Preliminary of an Aluminum Sulfate (Al2(SO4)3) plant using Alumina (Al2O3) from Bauxite and Sulfuric Acid (H2SO4) as raw materials. The overall production process using the Dorr process which uses 2 CSTR reactor and the reaction is endothermic (absorbs heat). The product from Reactor I (R-101) will get into Reactor II (R-102) that will be reacted with Barium Sulfide (BaS) to reduce Fe2(SO4)3 to simplify separation process. The slurry of Aluminium Sulfate will be pumpe to the Rotary Drum Vacuum Filter (RDVF-101) to separate the solids and liquids from the product before it concentration is concentrated in the Evaporator (EV-101). Then, it will pumped to the Spray Dryer (SD-101) for drying and changing the phase from liquid to powder. The product will get into Ball Mill (BM-102) for size reducing. The product will be carried by Belt Conveyor and Bucket Elevator to be stored in Silo before being packaged and stored in Warehouse. The capacity of Aluminium Sulfate is 48,000 tons/year with 330 working days/year. This plant location will be established in the Cilegon Industrial Area, Cilegon City, Banten, with a land area of 126,000 m². The company is intended to be a Limited Liability Company (PT) with a line and staff organizational structure and a workforce of 133 people. The water requirement for this plant is 32.460,72513 kg/hour which is obtained from PDAM Tirta Cilegon Mandiri on Cilegon Industrial Area. The Electricity source for this plant is obtained from generator with the power source of 226,629.4 kW. The Feasibility Studies from economic analysis which obtained: 1. Fixed Capital Investment = Rp 318.493.263.351,36 2. Working Capital Investment = Rp 35.388.140.372,37 3. Total Capital Investment = Rp 353.881.140.372,37 4. Total production cost = Rp 492.116.569.769,10 5. Sales revenue (SC) = Rp 607.673.204.954,20 6. Net profit = Rp 80.889.644.629,57 7. Pay Out Time (POT) = 3,1 years 8. Break Even Point (BEP) = 38,24 % 9. Internal Rate of Return = 16,97 % 10. Rate of Return = 23% Based on the technical and economic feasibility study, it can be concluded that the Preliminary Plant Design of this Aluminum Sulfate Plant is feasible to proceed to the design stage.
PRARANCANGAN PABRIK ALUMINIUM SULFAT DARI BAUKSIT DENGAN KAPA.SITAS PRODUKSI 60 TON PERHARI (DIni Andayani, 2024)
PRELIMENARY PLANT DESIGN OF ALUMINIUM SULFATE FROM BAUXITE USING DORR PROCESS WITH A CAPACITY 48.000 TONS/YEAR (Tia Amanda, 2024)
PRARANCANGAN PABRIK ALUMINIUM SULFAT DARI BAUKSIT MELALUI PROSES DORR DENGAN KAPASITAAS PRODUKSI 48.000 TON/TAHUN (Fathia Zahira Fauzi, 2024)
KONVERSI BAUKSIT MENJADI ALUMINIUM SULFAT DALAM REAKTOR BATCH (Zulfahmy, 2025)
PRARANCANGAN PABRIK ALUMINIUM SULFAT DARI KAOLIN DENGAN KAPASITAS PRODUKSI 19.800 TON/TAHUN (Mira Maulida, 2024)