Electronic Theses and Dissertation
Universitas Syiah Kuala
LAPORAN KERJA PRAKTEK
PENGUJIAN PIT (PILE INTEGRITY TEST) PADA PONDASI TIANG BOR (BORED PILE) DI RUMAH SAKIT UMUM DR. ZAINOEL ABIDIN (RSUDZA) BANDA ACEH
Pengarang
SHELLY HARFIDA NOVSAH - Personal Name;
Dosen Pembimbing
Yus Yudhyantoro - 197202032000121001 - Dosen Pembimbing I
Nafisah Al-Huda - 197901102008122001 - Dosen Pembimbing II
Nomor Pokok Mahasiswa
2004001010008
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (D3) / PDDIKTI : 22401
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik Sipil (D3)., 2024
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Pondasi pada lokasi pembangunan bunker RSU Dr.Zainoel Abidin, Bandar Baru, Kecamatan Kuta Alam, Banda Aceh – Aceh dibuat pada tahun 2017. Mengingat pentingnya pembangunan bunker ini, sehingga pada tahun 2023 di lakukan evaluasi apakah pondasi tiang yang sudah dibangun itu masih layak atau tidak. Untuk memastikan pondasi tersebut layak atau tidak maka dilakukan pengujian (Pile Integrity Test) PIT. Pile Integrity Test (PIT) merupakan pengujian yang dilakukan dengan memberikan gelombang tumbukan regangan rendah di kepala tiang lalu memantau respon gelombang tersebut. Tujuan penelitian ini untuk mengetahui respon getaran, kerusakan tiang dan kedalaman tiang. Metode penelitian yang dilakukan untuk melihat kerusakan tiang menggunakan alat PIT berdasarkan ASTM D-5882 (Standar Test Method for Low- Strain Impect Integrity Testing of Deep Fondations). Benda yang diuji adalah tiang bor dengan kedalaman tiang 28 m dan berdiameter 600 mm. Pengujian ini hanya dilakukan pada 2 titik tiang dari 46 tiang yaitu pada tiang titik 1 dan titik 5. Hasil pengujian menunjukkan respon getaran yang terjadi pada tiang titik 1 dan titik 5 tidak terdapat lonjakan getaran setelah gelombang pertama di permukaan tiang. Sehingga dikatakan tidak adanya kerusakan pada tiang di sepanjang 28 m tersebut. Hasil nilai impedansi (BTA) atau nilai keutuhan tiang pada pondasi tiang bor di titik 1 yaitu 80% dan 100% dengan kondisi slight damage (pile stil could be used). Dan pada pondasi tiang bor di titik 5 yaitu 100% dengan kondisi undamage (good pile). Kondisi slight damage menunjukan bahwa kondisi beton di sepanjang pondasi bor terdapat kerusakan ringan namun tidak mengurangi daya dukung aksial dan pada kondisi undamage menunjukan bahwa tidak ada kerusakan pada tiang uji.
The foundations at the bunker construction site at Dr. Zainoel Abidin General Hospital, Bandar Baru, Kuta Alam District, Banda Aceh - Aceh were made in 2017. Considering the importance of building this bunker, in 2023 an evaluation will be carried out whether the pile foundation that has been built is still feasible or not. No. To ensure that the foundation is suitable or not, a PIT test (Pile Integrity Test) is carried out. Pile Integrity Test (PIT) is a test carried out by applying a low strain impact wave to the pile head and then monitoring the response of the wave. The aim of this research is to determine the vibration response, pile damage and pile depth. The research method used to see pile damage was using a PIT tool based on ASTM D-5882 (Standard Test Method for Low-Strain Impact Integrity Testing of Deep Foundations). The object tested was a drilled pile with a pile depth of 28 m and a diameter of 600 mm. This test was only carried out at 2 pole points out of 46 poles, namely at pole point 1 and point 5. The test results showed that the vibration response that occurred at pole point 1 and point 5 was that there was no vibration spike after the first wave on the pole surface. So it is said that there was no damage to the 28 m long poles. The results of the impedance value (BTA) or pile integrity value on the drilled pile foundation at point 1 are 80% and 100% with slight damage (pile stil could be used). And the drilled pile foundation at point 5 is 100% with undamage condition (good pile). The slight damage condition shows that the condition of the concrete along the drilled foundation has light damage but does not reduce the axial bearing capacity and the undamage condition shows that there is no damage to the test pile.
PENGUJIAN PIT (PILE INTEGRITY TEST) PADA PONDASI TIANG BOR (BORED PILE) DI RUMAH SAKIT UMUM DR. ZAINOEL ABIDIN (RSUDZA) BANDA ACEH (SHELLY HARFIDA NOVSAH, 2024)
PERHITUNGAN DAYA DUKUNG DAN PENURUNAN PONDASI TIANG BOR (BORED PILE) BERDASARKAN DATA SPT PADA LOKASI PEMBANGUNAN BUNKER GEDUNG ONKOLOGI RSUD DR. ZAINOEL ABIDIN (Rio Tanjung, 2025)
PERHITUNGAN DAYA DUKUNG DAN PENURUNAN PONDASI TIANG BOR (BORED PILE) BERDASARKAN DATA SPT PADA LOKASI PEMBANGUNAN BUNKER GEDUNG ONKOLOGI RSUD DR. ZAINOEL ABIDIN (Rio Tanjung, 2025)
ANALISA METODE PELAKSANAAN DAN BIAYA LANGSUNG PONDASI TIANG PANCANG FRANKI PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT UMUM DR. ZAINOEL ABIDIN BANDA ACEH (Amarullah, 2024)
PRODUKTIVITAS PEKERJAAAN PONDASI BORED PILE PADA PROYEK JALAN AKSES CILINCING-JAMPEA TANJUNG PRIOK JAKARTA UTARA (Mega Yunita, 2014)